MOPWA037 Commissioning of the CERN Linac4 BPM System with 50 MeV Proton Beams 750
 
  • J. Tan, M. Ludwig, L. Søby, M. Sordet, M. Wendt
    CERN, Geneva, Switzerland
 
  The new Linac4 at CERN will provide a 160 MeV H ion beam for charge-exchange injection into the existing CERN accelerator complex. Shorted stripline pick-ups placed in the Linac intertank regions and the transfer lines will measure beam orbit, relative beam current, beam phase, and average beam energy via the time-of-flight between two beam pickups. A prototype Beam Position Monitor (BPM) system has been installed in the transfer line between the existing Linac2 and the Proton Synchrotron Booster (PSB) in order to study and review the complete acquisition chain. This paper presents measurements and performance of this BPM system operating with 50 MeV proton beams, and compares the results with laboratory measurements and electromagnetic simulations.  
 
THPWO078 Status of the Upgrade of the CERN PS Booster 3939
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2.0 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.