MOPEA063 | The First Results of the NESTOR Commissioning | 225 |
|
||
In the paper the first results of the NESTOR facility are presented. 60 MeV electron linac injector has been tested and the first electron beam with project parameters was registered at the screen monitors. Electron beam was passed through the transportation channel and injection system. As a result, the first turn of the storage ring was closed. | ||