WEPWA015 Progress in Construction of the 35 MeV Compact Energy Recovery Linac at KEK 2159
 
  • S. Sakanaka, S. Adachi, M. Akemoto, D.A. Arakawa, S. Asaoka, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, E. Kako, Y. Kamiya, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondou, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sasaki, K. Satoh, M. Satoh, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • R. Hajima, S.M. Matsuba, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    JAEA, Ibaraki-ken, Japan
  • H. Takaki
    ISSP/SRL, Chiba, Japan
 
  The 35-MeV Compact Energy Recovery Linac (the Compact ERL or cERL) is under construction at the High Energy Accelerator Research Organization (KEK) in Japan. With the Compact ERL, we aim at establishing cutting-edge technologies for the GeV-class ERL-based synchrotron light source. To install the accelerator components of the cERL, we have constructed a shielding room having an area of about 60 m x 20 m. We have then installed a 500-kV DC photocathode gun, a 5-MV superconducting (SC) cryomodule for the injector, a 30-MV SC cryomodule for the main linac, and some of the other components. High-power test on the main SC cryomodule is underway in December, 2012. High-power or high-voltage tests on the injector cryomodule and on the DC gun are planned during January to March, 2013. An injector of the Compact ERL will be commissioned in April, 2013. We report the newest status of its construction.  
 
WEPWO016 Construction of Main Linac Cryomodule for Compact ERL Project 2349
 
  • K. Umemori, K. Enami, T. Furuya, H. Sakai, M. Satoh, K. Shinoe
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  Compact ERL (cERL), which is a test facility of ERL, is under construction at KEK, in Japan. At the first stage of cERL project, electron beam will be accelerated by 30 MV at main linac region. We have developed a main linac cryomodule, which contains two L-band 9-cell superconducting cavities. Cavity assembly work was carefully done at a class-10 clean room and HOM absorbers and cold windows of input couplers were successfully mounted on the cavities. Next, the frequency tuners, thermal anchors, magnetic shields and temperature sensors and so on were assembled to the cryomodule. Then, using a clean-booth, warm windows of the input couplers are connected to the cold windows and gate valves were also attached to the both ends of the cryomodule. Finally, the cryomodule was installed into the beamline of cERL and connected to a 2K cryogenic system. Target of alignment precision of the cavities, after cooling down to 2K, are set to be within 1 mm against the beamline. The first cool-down test, followed by low power and high power measurements, is scheduled within the year 2012.  
 
THOBB203 Study on Fabrication of Superconducting RF 9-cell Cavity for ILC at KEK 3132
 
  • T. Saeki, Y. Ajima, K. Enami, H. Hayano, H. Inoue, E. Kako, S. Kato, S. Koike, T. Kubo, S. Noguchi, M. Satoh, M. Sawabe, T. Shishido, A. Terashima, N. Toge, K. Ueno, K. Umemori, K. Watanabe, Y. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, M. Yamanaka, K. Yokoya
    KEK, Ibaraki, Japan
  • Y. Iwashita
    Kyoto ICR, Uji, Kyoto, Japan
  • N. Kawabata, H. Nakamura, K. Nohara, M. Shinohara
    SPS, Funabashi-shi, Japan
  • F. Yasuda
    The University of Tokyo, Institute of Physics, Tokyo, Japan
 
  We constructed a new facility for the fabrication of superconducting RF cavity at KEK from 2009 to 2011. In the facility, we have installed a deep-drawing machine, a half-cell trimming machine, an electron-beam welding machine, and a chemical etching room in one place. We started the study on the fabrication of 9-cell cavity for International Linear Collier (ILC) from 2009 using this facility. The study is focusing on the cost reduction with keeping high performance of cavity, and the goal is the establishment of mass-production procedure for ILC. This article reports the current status of the studies in CFF.  
slides icon Slides THOBB203 [3.983 MB]