  We have been successfully commissioned two pulse steering magnets installed in the Linac to 3-GeV RCS (Rapid Cycling Synchrotron) injection beam transport (BT) line of J-PARC. RCS has to deliver a simultaneous as well as specific beam as demand by the downstream facilities of MLF (Material and Life Science Facility) and the MR (Main Ring). In order to obtain relatively a smaller transverse emittance at extraction, those magnets were designed to perform a smaller injection painting for the MR beam as compared to the MLF one. As stripper foil position is fixed for the charge exchange H injection, inclination of the injected beam centroid on foil for the MR beam is only moved to a smaller value by the pulse steering magnets, while DC septum magnets are fixed as determined first for the MLF beam. Their parameters were found to be very consistent with expectation and thus already in operation for switching to a painting area of 100 pi mm mrad for the MR beam as compared to that of 150 pi mm mrad for the MLF beam.  
 
MOPME023 ORBIT Beam Simulation Progress in the 3-GeV Rapid Cycling Synchrotron of J-PARC 521
 
  • P.K. Saha, H. Harada, H. Hotchi, Y. Shobuda, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • J.A. Holmes
    ORNL, Oak Ridge, Tennessee, USA
  • S. Kato
    Tohoku University, Graduate School of Science, Sendai, Japan
 
  We have made a numerous progress for beam simulation in the 3-GeV RCS (Rapid Cycling Synchrotron) of J-PARC (Japan Proton Accelerator Research Complex) by using 3-D particle tracking code, ORBIT. Namely, the TEAPOT lattice file used for ORBIT tracking has been made to give exactly same results to that with SAD model used for the RCS beam commissioning. In addition, time dependent lattice functions of the injection chicane magnets and similar other time dependent lattice imperfections, which are already found to have significant influences on the beam losses in the real machine have also been successfully introduced. At present, time dependent transverse and longitudinal impedances are going to be introduced. That should prove the ORBIT code much more matured for beam simulations in synchrotrons. Latest beam simulation results illustrating these new realistic features are presented.  
 
THPWO032 Progress of Injection Energy Upgrade Project for J-PARC RCS 3833
 
  • N. Hayashi, H. Harada, K. Horino, H. Hotchi, J. Kamiya, M. Kinsho, P.K. Saha, Y. Shobuda, T. Takayanagi, N. Tani, T. Togashi, T. Ueno, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  The injection energy of the J-PARC RCS will be upgraded in 2013. New power supplies for the shift bump magnet system will be installed. Some of other systems, upgrade of the painting bump power supplies and pulse steering systems, are already installed and tested or used for the nominal operation. The paper reports the progress of injection energy upgrade project.  
 
THPWO033 High Intensity Beam Trial of up to 540 kW in J-PARC RCS 3836
 
  • H. Hotchi, H. Harada, N. Hayashi, M. Kinsho, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
  • S. Kato
    Tohoku University, Graduate School of Science, Sendai, Japan
 
  Recently we have performed a high intensity beam trial of up to 540 kW. In this paper, beam intensity dependece and injection painting parameter dependence of beam loss, observed in this beam experiment, will be discussed with the corresponding numerical simulation results.