Author: Ptitsyn, V.
Paper Title Page
TUYB103 Status and Plans for the Polarized Hadron Collider at RHIC 1106
 
  • M. Bai, L. A. Ahrens, E.C. Aschenauer, G. Atoian, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, K.A. Drees, Y. Dutheil, O. Eyser, W. Fischer, C.J. Gardner, J.W. Glenn, X. Gu, M. Harvey, T. Hayes, H. Huang, R.L. Hulsart, A.I. Kirleis, J.S. Laster, C. Liu, Y. Luo, Y. Makdisi, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, S. Nemesure, P.H. Pile, A. Poblaguev, V. Ptitsyn, V.H. Ranjbar, G. Robert-Demolaize, T. Roser, W.B. Schmidke, V. Schoefer, F. Severino, T.C. Shrey, D. Smirnov, K.S. Smith, D. Steski, S. Tepikian, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, M. Wilinski, K. Yip, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
As the world’s only high energy polarized proton collider, the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) has been providing collisions of polarized proton beams at beam energy from 100~GeV to 255~GeV for the past decade to explore the proton spin structure as well as other spin dependent measurements. With the help of two Siberian Snakes per accelerator plus outstanding beam control, beam polarization is preserved up to 100~GeV. About 10% polarization loss has been observed during the acceleration between 100~GeV and 255~GeV due to several strong depolarizing resonances. Moderate polarization loss was also observed during a typical 8 hour physics store. This presentation will overview the achieved performance of RHIC, both polarization as well as luminosity. The plan for providing high energy polarized He-3 collisions at RHIC will also be covered.
This work is on behalf of RHIC team.
 
slides icon Slides TUYB103 [12.854 MB]  
 
TUPFI079 A Proposed “Delay Line” for Hadron Beams in RHIC 1532
 
  • N. Tsoupas, V. Litvinenko, V. Ptitsyn, D. Trbojevic
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
A “delay line” has been proposed to be installed in the Blue ring of the RHIC to accommodate collisions of asymmetric nuclei. The delay line can also be used in the e-RHIC accelerator to accommodate electron hadron collisions at various energies. We will present the layout and the optics of the delay line and we will discuss the energy range that asymmetric collisions can be performed in the RHIC collider.
 
 
TUPFI082 RHIC Performance for FY2012 Heavy Ion Run 1538
 
  • Y. Luo, J.G. Alessi, M. Bai, E.N. Beebe, J. Beebe-Wang, I. Blackler, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, J.J. Butler, R. Connolly, T. D'Ottavio, K.A. Drees, A.V. Fedotov, W. Fischer, C.J. Gardner, D.M. Gassner, X. Gu, Y. Hao, M. Harvey, T. Hayes, L.T. Hoff, H. Huang, P.F. Ingrassia, J.P. Jamilkowski, N.A. Kling, M. Lafky, J.S. Laster, C. Liu, D. Maffei, Y. Makdisi, M. Mapes, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, C. Naylor, S. Nemesure, A.I. Pikin, P.H. Pile, V. Ptitsyn, D. Raparia, G. Robert-Demolaize, T. Roser, P. Sampson, J. Sandberg, V. Schoefer, C. Schultheiss, F. Severino, T.C. Shrey, K.S. Smith, S. Tepikian, P. Thieberger, D. Trbojevic, J.E. Tuozzolo, B. Van Kuik, G. Wang, M. Wilinski, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
In the 2012 RHIC heavy ion run, we collided 96.4~GeV U-U ions and 100~GeV Cu-Au ions for the first time in RHIC. The new pre-injector with the electron-beam ion source (EBIS) was used to provide ions for RHIC ion collisions for the first time. By adding the horizontal cooling, the powerful 3-D stochastic cooling largely enhanced the luminosity. With the double bunch merging in the Booster and AGS, the bunch intensities of Cu and Au ions in RHIC surpassed their projections. Both PHENIX and STAR detectors reached their integrated luminosity goals for the U-U and Cu-Au collisions. In this article we review the machine improvement and performance in this run.
 
 
TUPFI084 RHIC Polarized Proton Operation for 2013 1544
 
  • V.H. Ranjbar, L. A. Ahrens, E.C. Aschenauer, M. Bai, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, K.A. Drees, Y. Dutheil, W. Fischer, C.J. Gardner, J.W. Glenn, X. Gu, M. Harvey, T. Hayes, H. Huang, R.L. Hulsart, A.I. Kirleis, J.S. Laster, C. Liu, Y. Luo, Y. Makdisi, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, S. Nemesure, P.H. Pile, A. Poblaguev, V. Ptitsyn, G. Robert-Demolaize, T. Roser, W.B. Schmidke, V. Schoefer, F. Severino, T.C. Shrey, D. Smirnov, K.S. Smith, D. Steski, S. Tepikian, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, M. Wilinski, K. Yip, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
  • O. Eyser
    UCR, Riverside, California, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The 2013 operation of the Relativistic Heavy Ion Collider (RHIC) marks the second year of running under the RHIC II era. Additionally this year saw the implementation of several important upgrades designed to push the intensity frontier. Two new E-lenses have been installed, along with a new lattice designed for the E-lens operation. A new polarized proton source which generates about factor of 2 more intensity was commissioned as well as a host of RF upgrades from a new longitudinal damper, Landau cavity in RHIC to a new low level RF and new harmonic structure for the AGS. We present an overview of the challenges and results from this years run.