MOPFI029 The Construction Progress of Beijing Radioactive Ion-beam Facility 345
 
  • T.J. Zhang, Shizhong. An, B.Q. Cui, Z.G. Li, Y.L. Lu, C.H. Peng, F. Yang
    CIAE, Beijing, People's Republic of China
 
  The Beijing Radioactive Ion-Beam Facility (BRIF) is being constructed at CIAE. The project consists of a 100 MeV high intensity cyclotron CYCIAE-100, an ISOL system with a mass resolution of 20000, and a superconducting booster. The construction of the building was started on April 28, 2011 and the roof was sealed on Jan. 16, 2012. The on-site installation conditions have been ready since Sept. 27, 2012. Up to now, the fabrication of all major components for CYCIAE-100 have been completed, including the main magnet system, the RF system, ion source and injection, main vacuum, etc. The equipment fabrication for the ISOL system has been completed and magnetic mapping and shimming is being performed on the large-scale analysis magnet. The fabrication of the major components for the superconducting booster has been accomplished, and the work on copper-niobium sputtering is under way. At present, the installation and assembly is in full swing and the beam commissioning is to predicted to be finished in mid 2013. Taking advantage of the experiences accumulated on the CRM cyclotron with beam up to 430 uA, it is likely that the first beams of 100 MeV can be achieved by the end of 2013.