Paper |
Title |
Page |
WEPEA063 |
Upgrades and Consolidation of the CERN AD for Operation during the Next Decades |
2654 |
|
- T. Eriksson, M. E. Angoletta, L. Arnaudon, J.A. Baillie, M. Calviani, F. Caspers, L.V. Joergensen, R. Kersevan, G. Le Godec, R. Louwerse, M. Ludwig, S. Maury, A. Newborough, C. Oliveira, G. Tranquille
CERN, Geneva, Switzerland
|
|
|
As the ELENA project is now well underway, focus is turned to the Antiproton Decelerator (AD) itself. Most of the machine’s key components are in operation since more than 25 years and a substantial consolidation program is now being launched in view of continued operation beyond 2025. Over the course of the next few years a progressive consolidation of the AD-Target area, the AD-ring and all associated systems will take place. Several investigations have recently been performed in the target area with the objective of establishing the radiation environment and the sensitivity of the antiproton production to potential misalignment of the production elements. Identification of reliability and serviceability issues of the AD-ring components and associated systems has been done and will continue during the 2013 shut-down. Planned and ongoing consolidation activities are also discussed with emphasis on stochastic and electron beam cooling, instrumentation, RF systems, vacuum, magnets, power converters and beam transfer equipment.
|
|
|
THPWO078 |
Status of the Upgrade of the CERN PS Booster |
3939 |
|
- K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H− ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2.0 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.
|
|
|
THPWO079 |
A Possible Scheme to Deliver 2 GeV Beams from the CERN PS Booster to the ISOLDE Facility |
3942 |
|
- K. Hanke, W. Bartmann, J.R.T. Cole, R. Fernandes Luis, A. Newborough, S. Pittet, T. Stora, D. Voulot
CERN, Geneva, Switzerland
|
|
|
The CERN PS Booster (PSB) is presently undergoing an upgrade program to increase its beam energy from 1.4 GeV to 2.0 GeV. While this energy upgrade is targeted at LHC-type beams, the option of delivering 2 GeV beams to the ISOLDE facility has also been investigated. In this paper we present a preliminary study for delivering 2 GeV beams to ISOLDE including the physics motivation and the implications on the accelerator hardware.
|
|
|