MOPWA035 Beam Loss Studies for the CERN PS Booster using FLUKA 744
 
  • S. Damjanovic, B. Dehning, B. Mikulec, M. Sapinski
    CERN, Geneva, Switzerland
 
  In view of future upgrade plans, the beam loss monitor (BLM) coverage of the PS Booster (PSB) rings was reviewed. The response of two types of monitors, LHC-IC and LHC-LIC, has been studied with FLUKA at LINAC4 injection and PSB extraction energies. The goal of this study was to find out whether the current beam loss monitor coverage of two monitors at a certain location per PSB section was adapted to potential beam losses associated with a future Linac4 injection. The outcome of this study was a proposal to double the number of beam loss monitors in the PSB section by using a combination of horizontally oriented LHC-IC and LHC-LIC type monitors.  
 
TUPWO047 Preliminary Results of Linear Optics From Orbit Response in the CERN PSB 1973
 
  • M.J. McAteer, C. Carli, B. Mikulec, R. Tomás
    CERN, Geneva, Switzerland
  • M. Aiba
    PSI, Villigen PSI, Switzerland
 
  Funding: This research project is supported by a Marie Curie Early Initial Training Network Fellowship of the European Community's Seventh Framework Programme under contract number (PITN-GA-2011-289485-OPAC)
Future operations for the CERN accelerator complex will require the PS Booster to deliver higher intensity beam without increasing emittances, and having an accurate knowledge of the machine’s lattice imperfections will be necessary. We present preliminary results of the analysis of orbit response measurements in the PS Booster to determine the linear optics and to identify field errors in each of the machine’s four rings.
 
 
WEPEA052 Investigations on CERN PSB Beam Dynamics with Strong Direct Space Charge Effects Using the PTC-ORBIT Code 2621
 
  • V. Forte, E. Benedetto, C. Carli, M. Martini, B. Mikulec, E. Métral, F. Schmidt
    CERN, Geneva, Switzerland
  • A.Y. Molodozhentsev
    KEK, Ibaraki, Japan
 
  The CERN PS Booster (PSB) is the first synchrotron of the LHC injector chain consisting out of four superposed rings and providing beam for many users. As part of the LIU project, the machine will be upgraded. Space charge and resonances are serious issues for the good quality of the beam at injection energy. Consequently simulations are needed to track the beam in the machine taking into account space charge effects: PTC-ORBIT has been used as tracking code. This paper presents simulations results compared with the measurements for machine performances evaluation and code-benchmarking purposes.  
 
THPFI045 Reliability Approach for Machine Protection Design in Particle Accelerators 3388
 
  • A. Apollonio, J.-B. Lallement, B. Mikulec, B. Puccio, J.L. Sanchez Alvarez, R. Schmidt, S. Wagner
    CERN, Geneva, Switzerland
 
  Particle accelerators require Machine Protection Systems (MPS) to prevent beam induced damage of equipment in case of failures. This becomes increasingly important for proton colliders with large energy stored in the beam such as LHC, for high power accelerators with a beam power of up to 10 MW, such as the European Spallation Source (ESS), and for linear colliders with high beam power and very small beam size. The reliability of Machine Protection Systems is crucial for safe machine operation; all possible sources of risk need to be taken into account in the early design stage. This paper presents a systematic approach to classify failures and to assess the associated risk, and discusses the impact of such considerations on the design of Machine Protection Systems. The application of this approach will be illustrated using the new design of the MPS for LINAC 4, a linear accelerator under construction at CERN.  
 
THPWO077 Status and Plans for the Upgrade of the LHC Injectors 3936
 
  • R. Garoby, H. Damerau, S.S. Gilardoni, B. Goddard, K. Hanke, A.M. Lombardi, D. Manglunki, M. Meddahi, B. Mikulec, L. Ponce, E.N. Shaposhnikova, R. Steerenberg, M. Vretenar
    CERN, Geneva, Switzerland
 
  The plans for preparing the LHC injectors to fulfill the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.  
 
THPWO078 Status of the Upgrade of the CERN PS Booster 3939
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2.0 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.