Author: Marcellini, F.
Paper Title Page
WEOBB203 Design of Phase Feed Forward System in CTF3 and Performance of Fast Beam Phase Monitors 2097
 
  • P. Skowroński, A. Andersson, A. Gerbershagen, E. Ikarios, J. Roberts
    CERN, Geneva, Switzerland
  • P. Burrows, G.B. Christian, A. Gerbershagen, C. Perry, J. Roberts
    JAI, Oxford, United Kingdom
  • P. Burrows, G.B. Christian, A. Gerbershagen, C. Perry
    Oxford University, Physics Department, Oxford, Oxon, United Kingdom
  • A. Ghigo, F. Marcellini
    INFN/LNF, Frascati (Roma), Italy
  • E. Ikarios
    National Technical University of Athens, Athens, Greece
 
  Funding: Work supported by the European Commission under the FP7 Research Infrastructures project Eu- CARD, grant agreement no. 227579
The CLIC two beam acceleration technology requires a drive beam phase stability of better than 0.3 deg rms at 12 GHz, corresponding to a timing stability below 50 fs rms. For this reason the CLIC design includes a phase stabilization feed-forward system. It relies on precise beam phase measurement and its subsequent correction in a chicane with help of fast kickers. A prototype of such a system is being installed in CLIC Test Facility CTF3. In this paper we describe in detail its design and implementation. Additionally, we present and discuss the performance of the precision phase monitor prototypes installed at the end of the CTF3 linac, measured with the drive beam.
We would like to acknowledge support of G.Sensolini, A.Zolla (INFN/LNF Frascati), N.S.Chritin and J-M.Scigliuto (CERN) in design and fabrication of components.
 
slides icon Slides WEOBB203 [6.770 MB]  
 
WEPME061 A Wideband Slotted Kicker Design for SPS Transverse Intra-bunch Feedback 3073
 
  • J.M. Cesaratto, J.D. Fox, C.H. Rivetta
    SLAC, Menlo Park, California, USA
  • D. Alesini, A. Drago, A. Gallo, F. Marcellini, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • S. De Santis
    LBNL, Berkeley, California, USA
  • W. Höfle
    CERN, Geneva, Switzerland
 
  Funding: Work supported by the U.S. Department of Energy under contract DE-AC02-76SF00515 and the US LHC Accelerator Research Program (LARP) and by the EU FP7 HiLumi LHC - Grant Agreement 284404.
Control and mitigation of transverse beam instabilities caused by electron cloud and TMCI will be essential for the SPS to meet the beam intensity demands for the HL-LHC upgrade. A wideband intra-bunch feedback method is in development, based on a 4 GS/s data acquisition and processing, and with a back end frequency structure extending to 1 GHz. A slotted type kicker, similar to those used for stochastic cooling, has been considered as the terminal element of the feedback chain. It offers the most promising deflecting structure characteristics to meet the system requirements in terms of bandwidth, shunt impedance, and beam coupling impedance. Different types of slotted structures have been explored and simulated, including a ridged waveguide and coaxial type waveguide. In this paper we present our findings and the conceptual design of a vertical SPS wideband kicker consistent with the stay clear, vacuum, frequency band coverage, and peak shunt impedance requirements.