Author: Liu, Y.-H.
Paper Title Page
MOPWA042 The Leakage Current Induced by Stray Capacitance in the Pulse Magnet System 762
 
  • C.S. Chen, C.K. Chan, K.H. Hsu, Y.-H. Liu, C.S. Yang
    NSRRC, Hsinchu, Taiwan
 
  A huge amount of current must be provided during the nominal operation of the pulse magnet system in TPS (Taiwan Photon Source). It comes with all kinds of electromagnetic noises, including radiated and conducted EMI (electromagnetic interferences). The primary object of this article is to clarify the paths of induced EMI, especially by means of capacitance induction. Furthermore, some geometrical suggestions which had been tested are listed in this paper as the guidelines of the pulse magnet design. According to the measurement, proper distance and surface area lead to sufficient insulation and reduce the leakage current under the expected value.  
 
MOPWA043 The HV Withstands Test for In Vacuum Booster Kicker 765
 
  • Y.-H. Liu, C.K. Chan, C.S. Chen, H.H. Chen, J.-R. Chen, K.H. Hsu, H.P. Hsueh, Y.T. Huang, C.S. Yang
    NSRRC, Hsinchu, Taiwan
 
  The maximum driving voltage of TPS booster extraction kicker is close to 30 kV, the HV insulation should be carefully noticed. A DC withstand voltage tester MUSASHI 3802 (Model: IP-701G) is used to test the DC breakdown voltage, which the maximum driving voltage is 37 kV. The 10 mm gap between coil and ferrite is designed in order to increase HV break down voltage. The safety breakdown distance between HV coil and grounding plate was tested in air. Different insulation material with different thickness was tested the breakdown voltage. Thicker than 10 mm ceramic plate could effectively avoid the breakdown occurred with 37 kV DC charging. Thus HV withstand voltage will be higher in vacuum chamber and the insulation with HV will not be the problem.  
 
THPFI068 Status of the Utility System Construction for the 3 GeV TPS Storage Ring 3454
 
  • J.-C. Chang, W.S. Chan, J.-R. Chen, Y.F. Chiu, Y.-C. Chung, C.W. Hsu, K.C. Kuo, Y.-C. Lin, C.Y. Liu, Y.-H. Liu, Z.-D. Tsai, T.-S. Ueng
    NSRRC, Hsinchu, Taiwan
 
  The construction of the utility system for the 3.0 GeV Taiwan Photon Source (TPS) was started in the end of 2009. The utility building for the TPS ring has been completed in the end of 2012. Main utility equipment has been installed inside. The whole construction of the utility system is scheduled to be completed in the mid of 2013. Total budget of this construction is about four million dollars. This utility system presented in this paper includes the electrical power, cooling water, air conditioning, compressed air and fire control systems.