THPWO045 Commissioning Plan for the CSNS Linac 3869
 
  • J. Peng, S. Fu, J. Li, Y. Li, H.C. Liu, H.F. Ouyang, N. Wang, S. Wang, T.G. Xu
    IHEP, Beijing, People's Republic of China
 
  The linac of the China Spallation Neutron Source(CSNS) will be commissioned from October 2013. The linac will be commissioned in three phases. The delivery of beam to the RCS is planned for October 2015. This paper describes the commissioning plans for the MEBT and DTL parts of the linac. Techniques for finding the RF set-point, matching and steering are presented, as well as codes to assist in the beam commissioning.  
 
FRXAB201 Status of CSNS Project 3995
 
  • S. Fu, H. Chen, Y.W. Chen, H. Dong, S.X. Fang, K.X. Huang, W. Kang, J. Li, H.C. Liu, L. Ma, H.F. Ouyang, H. Qu, H. Sun, J.Y. Tang, C.H. Wang, Q.B. Wang, S. Wang, T.G. Xu, Z.X. Xu, C. Zhang, J. Zhang
    IHEP, Beijing, People's Republic of China
 
  The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planed to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project.  
slides icon Slides FRXAB201 [4.320 MB]