Author: Jensen, L.K.
Paper Title Page
MOPFI050 Non-local Fast Extraction from the CERN SPS at 100 and 440 GeV 392
 
  • F.M. Velotti, A. Alekou, W. Bartmann, E. Carlier, K. Cornelis, I. Efthymiopoulos, B. Goddard, L.K. Jensen, V. Kain, M. Kowalska, V. Mertens, R. Steerenberg
    CERN, Geneva, Switzerland
 
  The Long Straight Section 2 (LSS2) of the CERN SPS is connected with the North Area (NA), to which the beam to date has always been extracted using a resonant extraction technique. For new proposed short- and long-baseline neutrino experiments, a fast single turn extraction to this experimental area is required. As there are no kickers in LSS2, and the integration of any new kickers with the existing electrostatic septum would be problematic, a solution has been developed to fast extract the beam using non-local extraction with other SPS kickers. Two different kicker systems have been used, the injection kicker in LSS1 and the stronger extraction kicker in LSS6 to extract 100 and 440 GeV beam, respectively. For both solutions a large emittance beam was extracted after 5 or 9 full betatron periods. The concept and simulation details are presented with the analysis of the aperture and beam loss considerations and experimental results collected during a series of beam tests.  
 
MOPFI052 A New Lead Ion Injection System for the CERN SPS with 50 ns Rise Time 398
 
  • B. Goddard, O. Aberle, J. Borburgh, E. Carlier, K. Cornelis, L. Ducimetière, L.K. Jensen, T. Kramer, D. Manglunki, A. Mereghetti, V. Mertens, D. Nisbet, B. Salvant, L. Sermeus
    CERN, Geneva, Switzerland
 
  The LHC High Luminosity upgrade project includes a performance upgrade for heavy ions. One of the present performance limitations is the rise time of the SPS injection kicker system, which imposes a spacing of at least 220 ns between injected bunch trains at the operational rigidity. A reduction of this rise time to 50 ns for lead ions is requested as part of the suite of measures needed to increase the present design performance by a factor three. A new injection system based on a fast pulsed septum and a fast kicker has been proposed to fulfil this rise time requirement, and to meet all the constraints associated with the existing high intensity proton injection in the same region. This paper describes the concept and the required equipment parameters, and explores the implications of such a system for SPS operation.  
 
TUPEA051 Beam Transfer Line Design for a Plasma Wakefield Acceleration Experiment (AWAKE) at the CERN SPS 1247
 
  • C. Bracco, J. Bauche, D. Brethoux, V. Clerc, B. Goddard, E. Gschwendtner, L.K. Jensen, A. Kosmicki, G. Le Godec, M. Meddahi, C. Mutin, J.A. Osborne, K.D. Papastergiou, A. Pardons, F.M. Velotti, H. Vincke
    CERN, Geneva, Switzerland
  • P. Muggli
    MPI, Muenchen, Germany
 
  The world’s first proton driven plasma wakefield acceleration experiment is presently being studied at CERN. The experiment will use a high energy proton beam extracted from the SPS as driver. Two possible locations for installing the AWAKE facility are considered: the West Area and the CNGS long baseline beam-line. The previous transfer line from the SPS to the West Area was completely dismantled in 2000 and it would need to be fully re-designed and re-built. For this option, geometric constraints for radio protection reasons would limit the maximum proton beam energy to 300 GeV. The existing CNGS line could be used by applying only minor changes to the final part of the lattice for the final focusing and the interface between the proton beam and the laser, required for plasma ionisation and bunch-modulation seeding. The beam line design studies performed for the two options are presented.  
 
WEPEA053 Progress with the Upgrade of the SPS for the HL-LHC Era 2624
 
  • B. Goddard, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, F. Caspers, K. Cornelis, H. Damerau, L.N. Drøsdal, L. Ducimetière, J.F. Esteban Müller, R. Garoby, M. Gourber-Pace, W. Höfle, G. Iadarola, L.K. Jensen, V. Kain, R. Losito, M. Meddahi, A. Mereghetti, V. Mertens, Ö. Mete, E. Montesinos, Y. Papaphilippou, G. Rumolo, B. Salvant, E.N. Shaposhnikova, M. Taborelli, H. Timko, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The demanding beam performance requirements of the HL-LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.  
 
THPEA040 Design of a Magnetic Bump Tail Scraping System for the CERN SPS 3228
 
  • Ö. Mete, J. Bauche, F. Cerutti, S. Cettour Cave, K. Cornelis, L.N. Drøsdal, F. Galleazzi, B. Goddard, L.K. Jensen, V. Kain, Y. Le Borgne, G. Le Godec, M. Meddahi, E. Veyrunes, H. Vincke, J. Wenninger
    CERN, Geneva, Switzerland
  • A. Mereghetti
    UMAN, Manchester, United Kingdom
 
  The LHC injectors are being upgraded to meet the demanding beam specification required for High Luminosity LHC (HL-LHC) operation. In order to reduce the beam losses which can trigger the sensitive LHC beam loss interlocks during the SPS-to-LHC beam injection process, it is important that the beam tails are properly scraped away in the SPS. The current SPS tail cleaning system relies on a moveable scraper blade, with the positioning of the scraper adjusted over time according to the orbit variations of the SPS. A new robust beam tail cleaning system has been designed which will use a fixed scraper block towards which the beam will be moved by a local magnetic orbit bump. The design proposal is presented, together with the related beam dynamics studies and results from machine studies with beam.