Author: Holmes, S.D.
Paper Title Page
TUOAB102 Project X Injector Experiment: Goals, Plan and Status 1093
 
  • A.V. Shemyakin, S.D. Holmes, D.E. Johnson, M. Kaducak, R.D. Kephart, V.A. Lebedev, C.S. Mishra, S. Nagaitsev, N. Solyak, R.P. Stanek, V.P. Yakovlev
    Fermilab, Batavia, USA
  • D. Li
    LBNL, Berkeley, California, USA
  • P.N. Ostroumov
    ANL, Argonne, USA
 
  Funding: This work was supported by the U.S. DOE under Contract No.DE-AC02-07CH11359
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of the Project X. This program is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. Integrated systems testing, known as the Project X Injector Experiment (PXIE), will be accomplished with a new test facility under construction at Fermilab and will be completed over the period FY12- 17. PXIE will include an H ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.
 
slides icon Slides TUOAB102 [1.615 MB]