Paper |
Title |
Page |
WEIB203 |
Industrialization of ILC from a View Point of Industry |
2110 |
|
- K. Sennyu, H. Hara, F. Inoue, K. Kanaoka, K. Okihira
MHI, Hiroshima, Japan
|
|
|
Cavity performance has been improved by various efforts to meet the ILC spec stably in these days. For industrialization, not only Quality but also Cost and Delivery time, that is, QCD are important. We report our activities for stable quality and cost reduction in this report.
|
|
|
Slides WEIB203 [5.789 MB]
|
|
|
WEPWO013 |
High Power Tests of Injector Cryomodule for Compact-ERL |
2340 |
|
- E. Kako, D.A. Arakawa, K. Hara, T. Honma, H. Katagiri, Y. Kojima, Y. Kondo, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, T. Shishido, T. Takenaka, K. Watanabe, Y. Yamamoto
KEK, Ibaraki, Japan
- H. Hara, H. Hitomi, K. Sennyu
MHI, Hiroshima, Japan
|
|
|
In the cERL injector cryomodule, electron beams of 10 mA are accelerated from the beam energy of 500 keV to 5 MeV. A three 2-cell cavity system was chosen for the cERL injector. Each cavity is driven by two input couplers to reduce a required RF power handling capacity and also to compensate a coupler kick. In the cERL injector cryomodule, critical hardware components are not superconducting cavities but RF input couplers operating in CW mode. Six input couplers for the installation in the cryomodule were fabricated, and three pairs of input couplers were carefully conditioned. Costruction status, cool-down tests and high power RF test results on injector cryomodule for compact-ERL at KEK will be discussed in this paper.
|
|
|