MOPFI026 Thermal Simulations of a New Target Configuration for Production of Radioactive Nuclide 336
 
  • L.H. Chen, B.Q. Cui, Q.H. Huang, W. Jiang, R. Ma, Y.J. Ma, B. Tang
    CIAE, Beijing, People's Republic of China
 
  China Advanced Rare Ion-beam Facility (CARIF) based on China Advanced Research Reactor (CARR) has been proposed in order exploring the frontier of nuclear physics. A target with 5 g 235U is proposed in the project. The thermal neutron fission of 235U will produce radioactive nuclei and the great thermal load (~50 kW). The target of CARIF needs endure high temperature and thermal energy deposit. A new multi-targets configuration is proposed. It consists of several discrete targets instead of traditional single-target structure used in accelerator driven facility. Because there is more thermal radiation area in this configuration, thermal radiation capacity is enhanced, so the target can withstand higher thermal power. The temperature distribution of multi-targets was simulated with finite element code. The results show that the configuration of multi targets can effectively reduce the target temperature. From the perspective of target temperature distribution, the configuration could endure 50kW thermal deposit. It's possible to use 5 g 235U in CARIF for production of radioactive nuclide.  
 
MOPFI027 The Progress of the BRISOL Facility at CIAE 339
 
  • B. Tang, L.H. Chen, B.Q. Cui, Q.H. Huang, W. Jiang, R. Ma, Y.J. Ma, Z. Peng
    CIAE, Beijing, People's Republic of China
 
  Beijing Radioactive Ion-beam Facilities Isotope Separator On-Line (BRISOL), aiming to generate short life radioactive ion beam (RIB) on-line, is being constructed at China Institute of Atomic Energy(CIAE). Up to now, construction of major equipment for BRISOL is completed, including ion source, vacuum system, separator, optical element, and beam diagnostic system, and assembling is underway in laboratory. The on-site installation of all the beam line will be carried out soon. All the major element prototype including surface ion source, quadrupole, hexapole, multipole and beam diagnostic system have been studied off-line on a test-bench for BRISOL. A Li beam was generated and separated . The primary tests show that the ion source and the optical elements work well. The test charge exchange cell (CEC) is under way. BRISOL will be commissioned next year.  
 
MOPFI029 The Construction Progress of Beijing Radioactive Ion-beam Facility 345
 
  • T.J. Zhang, Shizhong. An, B.Q. Cui, Z.G. Li, Y.L. Lu, C.H. Peng, F. Yang
    CIAE, Beijing, People's Republic of China
 
  The Beijing Radioactive Ion-Beam Facility (BRIF) is being constructed at CIAE. The project consists of a 100 MeV high intensity cyclotron CYCIAE-100, an ISOL system with a mass resolution of 20000, and a superconducting booster. The construction of the building was started on April 28, 2011 and the roof was sealed on Jan. 16, 2012. The on-site installation conditions have been ready since Sept. 27, 2012. Up to now, the fabrication of all major components for CYCIAE-100 have been completed, including the main magnet system, the RF system, ion source and injection, main vacuum, etc. The equipment fabrication for the ISOL system has been completed and magnetic mapping and shimming is being performed on the large-scale analysis magnet. The fabrication of the major components for the superconducting booster has been accomplished, and the work on copper-niobium sputtering is under way. At present, the installation and assembly is in full swing and the beam commissioning is to predicted to be finished in mid 2013. Taking advantage of the experiences accumulated on the CRM cyclotron with beam up to 430 uA, it is likely that the first beams of 100 MeV can be achieved by the end of 2013.  
 
TUPWA022 Beam Dynamics Design of a 325 MHz RFQ 1772
 
  • F.J. Jia, J.E. Chen, G. Liu, Y.R. Lu, X.Q. Yan
    PKU, Beijing, People's Republic of China
  • B.Q. Cui, J.H. Li, G.H. Wei
    CIAE, Beijing, People's Republic of China
 
  The beam dynamic design of a 325 MHz Radio Frequency Quadrupole (RFQ) is presented in this paper. This 4-vane RFQ will accelerate pulsed proton beam from 30 keV to 3 MeV with repetition frequency of 1 MHz. A 1 MHz chopper and a 5 MHz buncher are arranged in the Low-Energy-Beam-Transport (LEBT) to produce the injected beam. The beam length at the RFQ entrance is about 3 ns, and the energy-spread is about 10%. The code of PARMTEQM is used to simulate RFQ structure. The design should realize high transmission for very high intensity beam meanwhile low emittance growth and relatively short length should be kept.