Author: Adraktas, P.
Paper Title Page
MOPWA030 Upgrade of the LHC Injection Kicker Magnets 729
 
  • M.J. Barnes, P. Adraktas, V. Baglin, G. Bregliozzi, S. Calatroni, F. Caspers, H.A. Day, L. Ducimetière, M. Garlaschè, V. Gomes Namora, J.M. Jimenez, N. Magnin, V. Mertens, E. Métral, B. Salvant, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The two LHC injection kicker systems, comprising 4 magnets per ring, produce a kick of 1.3 T.m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the high intensity LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns while providing an adequate beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, now results in substantial heating of the ferrite yoke, sometimes requiring cool down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all 8 kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will also be modified to help reduce the vacuum pressure in the kickers during high-intensity operation. This paper discusses the upgrades as well as their preparation and planning.  
 
MOPWA032 Reduction of Surface Flashover of the Beam Screen of the LHC Injection Kickers 735
 
  • M.J. Barnes, P. Adraktas, S. Calatroni, F. Caspers, L. Ducimetière, V. Gomes Namora, V. Mertens, R. Noulibos, M. Taborelli, B. Teissandier, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The LHC injection kicker magnets include beam screens to shield the ferrite yokes against wake fields resulting from the high intensity beam. The screening is provided by conductors lodged in the inner wall of a ceramic support tube. Operation with increasingly higher bunch intensity, and narrow bunches, now requires improved ferrite screening. This will be implemented by additional conductors; however the good high-voltage behaviour of the kicker magnets must not be compromised by the supplementary screening. Extensive studies and optimisations have been carried out, to better satisfy the often conflicting requirements for low beam coupling impedance, fast magnetic field rise-time, high vacuum and good high voltage behaviour. A new configuration is proposed which reduces significantly the electric field associated with the screen conductors and the secondary electron yield of the surface of the ceramic tube. Results of high voltage test results are also presented.