MOPPP077 Heat Load Budget on TPS Undulator in Vacuum 741
 
  • J.C. Huang, J. Chen, C.-S. Hwang, F.-Y. Lin, Y.T. Yu
    NSRRC, Hsinchu, Taiwan
 
  The performance of an insertion device is limited by the magnet gap because a small gap affects the dynamic aperture and results in a short life time of the beam. An in-vacuum undulator is designed to have no vacuum chamber between the magnet arrays so to allow the entire magnet gap to be fully used for the dynamic aperture. An in-vacuum undulator can optimally minimize the gap to achieve continuous energy spectra. One problem of an undulator with a small gap is resistive wall heating by the image current. The heat load depends strongly on the injected mode in the storage ring; injection of multiple bunches might deteriorate the thermal performance for the magnet array. In this paper, we present a calculation of the heat load budget for a magnet array of an in-vacuum undulator of Taiwan Photon Source (TPS).  
 
THPPD015 Character and Performance of Magnets for the TPS Storage Ring 3527
 
  • J.C. Jan, C.-H. Chang, H.-H. Chen, Y.L. Chu, C.-S. Hwang, C.Y. Kuo, F.-Y. Lin, C.S. Yang, Y.T. Yu
    NSRRC, Hsinchu, Taiwan
 
  The Taiwan Photon Source (TPS) is a third-generation light source. The orbit of the electron beam will be controlled with 48 dipoles, 240 quadrupoles, 168 sextupoles and several correctors in the storage ring. The construction of the first magnets for one sector, including prototype magnets, is to be completed during 2011 December. The mechanical dimensions of these magnets have been examined on a precise 3D-coordinate-measuring machine (CMM). The field strength, effective length and multipole errors were inspected with a rotating-coil measurement system (RCS) and a Hall-probe measurement system (HPS). The field center of the quadrupole and sextupole magnets is shimmed with a precise shimming block on the RCS bench. The inaccuracy of the position of the field center will be within 0.01 mm after shimming the feet. This work reports the current status, the construction performance, the mechanical shimming algorithm and the relative construction issue of the high precision magnet.