TUPPP087 Commissioning of the Fritz Haber Institute Mid-IR FEL 1792
 
  • A.M.M. Todd, H. Bluem, D. Dowell, R. Lange, J.H. Park, J. Rathke, L.M. Young
    AES, Medford, NY, USA
  • W. Erlebach, S. Gewinner, H. Junkes, A. Liedke, G. Meijer, W. Schöllkopf, W.Q. Zhang, G. von Helden
    FHI, Berlin, Germany
  • S.C. Gottschalk
    STI, Washington, USA
  • K. Jordan
    Kevin Jordan PE, Newport News, Virginia, USA
  • U. Lehnert, P. Michel, W. Seidel
    HZDR, Dresden, Germany
  • R. Wünsch
    FZD, Dresden, Germany
 
  The IR and THz FEL at the Fritz Haber Institute (FHI) in Berlin is designed to deliver radiation from 4 to 400 microns. A single-plane-focusing undulator combined with a 5.4-m-long cavity is used is the mid-IR (< 50 micron), while a two-plane-focusing undulator in combination with a 7.2-m-long cavity with a 1-D waveguide for the optical mode is planned for the far-IR. Beam was delivered to the IR beam dump in November 2011. We describe progress since that time in completing the commissioning of the mid-IR beamline and the status of the far-IR beamline design and fabrication.  
 
THPPC014 Commissioning Status of the 3 MeV RFQ for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University 3305
 
  • Q.Z. Xing, Y.J. Bai, D.T. Bin, J.C. Cai, C. Cheng, L. Du, Q. Du, C. Jiang, Q. Qiang, D. Wang, X.W. Wang, Z.F. Xiong, S.Y. Yang, H.Y. Zhang, S.X. Zheng
    TUB, Beijing, People's Republic of China
  • J.H. Billen
    TechSource, Santa Fe, New Mexico, USA
  • W.Q. Guan, Y. He, J. Li
    NUCTECH, Beijing, People's Republic of China
  • X.L. Guan
    Tsinghua University, Beijing, People's Republic of China
  • J. Stovall
    CERN, Geneva, Switzerland
  • L.M. Young
    AES, Medford, NY, USA
 
  Funding: Work supported by the “985 Project” of the Ministry of Education of China.
We present, in this paper, the commissioning status of a Radio Frequency Quadrupole (RFQ) accelerator for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University. In 2012 the 3-meter-long RFQ will deliver 3 MeV protons to the downstream High Energy Beam Transport (HEBT) with the peak current of 50 mA, pulse length of 0.5 ms and beam duty factor of 2.5%. Braze of the vanes was completed in September, 2011. The final field tuning of the whole cavity was completed in October, 2011. Initial commissioning will be underway at the beginning of 2012.