Author: Takagi, A.
Paper Title Page
WEPPR008 Simulation of Controlled Longitudinal Emittance Blow-up in J-PARC RCS 2952
 
  • M. Yamamoto, M. Nomura, A. Schnase, T. Shimada, F. Tamura
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • E. Ezura, K. Hara, K. Hasegawa, C. Ohmori, A. Takagi, K. Takata, M. Toda, M. Yoshii
    KEK, Tokai, Ibaraki, Japan
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  In the J-PARC RCS, a high intensity beam is prepared for the MR. The longitudinal beam emittance at the RCS extraction should be optimized to avoid beam loss during and after MR injection. In order to match the longitudinal emittance shape between the RCS and the MR, it is desirable to enlarge the longitudinal emittance during the RCS acceleration. We have performed the particle tracking simulation for the controlled longitudinal emittance blow up in the RCS.  
 
THPPC006 Status of the J-PARC Ring RF Systems 3281
 
  • M. Yoshii, E. Ezura, K. Hara, K. Hasegawa, C. Ohmori, A. Takagi, K. Takata, M. Toda
    KEK, Tokai, Ibaraki, Japan
  • M. Nomura, A. Schnase, T. Shimada, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-mura, Japan
 
  Due to the 11th march earthquakes, J-PARC was forced to stop operation. The restoration is following the schedule so that J-PARC is restarted in December. Before the earthquake, we had considerable success in the 400 kW equivalent proton beam in the RCS. Multi-harmonic RF feedforward was established, which contributes to the reduction of beam loss and stable acceleration in RCS. The MR synchrotron achieved stable 150 kW beam operation for the T2K experiment. This summer, we installed two new RF systems in MR. Eight RF systems in total allow a more stable beam acceleration and flexible bunch shape manipulation. Also, we prepare the RF feedforward to compensate beam loading in MR. To achieve a beam power in excess of 1 MW in MR, it is considered to double the MR repetition rate. We developed an annealing scheme for large magnetic alloy cores while inside a DC B-field that results in higher core impedance, and have succeeded in producing large FT3L cores in this summer. With such cores we can almost double the accelerating voltage without re-designing the existing RF sources. For the near future, we plan to replace the existing RF cavities with upgraded cavities using the FT3L cores.