Author: Shih, H.M.
Paper Title Page
TUPPP026 RF Rescue Option for TPS Linac 1668
 
  • K.L. Tsai, H.-P. Chang, C.-T. Chen, C.-S. Fann, K.T. Hsu, S.Y. Hsu, K.-K. Lin, H.M. Shih
    NSRRC, Hsinchu, Taiwan
  • K. Dunkel, C. Piel
    RI Research Instruments GmbH, Bergisch Gladbach, Germany
 
  The 150 MeV linac of Taiwan Photon Source was commissioned in June 2011. It consists of 90 keV electron source, bunching system and three S-band accelerating sections driven by three high-power klystrons. The rf system is equipped with rescue option such that the rf power from second klystron can be split and fed into both accelerating section 1 and 2. The rescue operation will be needed in the event of a failure occurred at the first klystron. In the report, the rescue capability will be illustrated and the test results will also be discussed.  
 
THPPD067 Performance of Kicker Pulsers for TPS Project 3665
 
  • C.-S. Fann, C.-T. Chen, K.T. Hsu, S.Y. Hsu, J.C. Huang, K.-K. Lin, K.-B. Liu, H.M. Shih, K.L. Tsai
    NSRRC, Hsinchu, Taiwan
 
  A set of kicker power suppliers has been designed and fabricated for storage ring beam injection of the Taiwan Photon Source (TPS) project. In order to fulfill the requirements, the performance of the designed units has been bench tested and the results are examined. The matching in four pulsers, the pulse-to-pulse stability and the time jitter are specified according to the beam injection requirements. The engineering evaluation and the measurement results are briefly discussed.