Author: Qian, H.J.
Paper Title Page
MOPPP008 Hard X-ray Generation Experiment at Tsinghua Thomson Scattering X-Ray Source 583
 
  • Y.-C. Du, H. Chen, Q. Du, Hua, J.F. Hua, W.-H. Huang, H.J. Qian, C.-X. Tang, H.S. Xu, L.X. Yan, Z. Zhang
    TUB, Beijing, People's Republic of China
 
  Recently, there is increasing industrial and scientific interesting in ultra-fast, high peak brightness, tunable energy and polarization, monochromatic hard X-ray source. The X-ray source based on the Thomson scattering between the relativistic electron beam and TW laser pulse is the suitable candidate for its compact and affordable alternatives for high brightness hard monochromatic X-ray generation. Accelerator laboratory in Tsinghua University al so proposed and built Tsinghua Thomson scattering X-ray source. The hard x-ray pulse has been generated in experiment with 47 MeV electron and 20 TW laser in this year, and the parameters of the X-ray have been measured preliminarily. The experimental results are presented and discussed in this paper.  
 
TUPPC024 R&D of an Ultrafast Probe Apparatus Based on MeV Electron Diffraction at Tsinghua University 1215
 
  • X.H. Lu, Y.-C. Du, W.-H. Huang, H.J. Qian, C.-X. Tang
    TUB, Beijing, People's Republic of China
 
  Funding: This work is supported by National Natural Science Foundation of China and National Basic Research Program of China (973 Program).
An ultrafast probe apparatus based on MeV ultrafast electron diffraction is developed at Tsinghua University. It aims at generating 1.5 to 3 MeV pulse with sub-pC charge and sub-ps pulse length for pump-probe experiments. It consists of an S-band 1.6-cell radiofrequency photocathode gun, a solenoid, a sample chamber, a deflecting cavity, a detection system and other diagnostics tools. Simulations show the position of solenoid coil affects the spot size on detection screen and the charge of collimated bunch significantly. The collimator is found to be helpful to stabilize the charge of collimated bunch and reduce its normalized emittance. The construction of the apparatus is almost finished and the commissioning test will start soon.