- J. Branlard, G. Ayvazyan, V. Ayvazyan, M.K. Grecki, M. Hoffmann, T. Jeżyński, I.M. Kudla, T. Lamb, F. Ludwig, U. Mavrič, S. Pfeiffer, H. Schlarb, Ch. Schmidt, H.C. Weddig, B.Y. Yang
DESY, Hamburg, Germany
- P. Barmuta, S. Bou Habib, L. Butkowski, K. Czuba, M. Grzegrzółka, E. Janas, J. Piekarski, I. Rutkowski, D. Sikora, L. Zembala, M. Żukociński
Warsaw University of Technology, Institute of Electronic Systems, Warsaw, Poland
- W. Cichalewski, K. Gnidzińska, W. Jałmużna, D.R. Makowski, A. Mielczarek, A. Napieralski, P. Perek, A. Piotrowski, T. Pożniak, K.P. Przygoda
TUL-DMCS, Łódź, Poland
- S. Korolczuk, J. Szewiński
The Andrzej Soltan Institute for Nuclear Studies, Centre Świerk, Świerk/Otwock, Poland
- K. Oliwa, W. Wierba
IFJ-PAN, Kraków, Poland
|
|
|
- J. Branlard, V. Ayvazyan, T. Jeżyński, H. Schlarb
DESY, Hamburg, Germany
- W. Cichalewski, W. Jałmużna, A. Piotrowski
TUL-DMCS, Łódź, Poland
|
|
|
During the installation phase of the European XFEL (2014), an average of one superconducting cryomodule per week will be tested and validated before being installed into the XFEL tunnel. Extensive tests will be carried in order to assess the RF performance of each cryomodule. A series of low level RF (LLRF) tests are planned as part of this validation phase, and will assess the cryomodule effective operating gradient, tuning range, compensation of Lorentz force detuning and microphonic behavior. These tests will be carried at DESY, in the Cryomodule Test Bench (CMTB) during the early stage of cryomodule production, and later at the Accelerating Module Test Facility (AMTF). Due to the pace and quantity of the modules to be tested, these tests have to be fully automated. This contribution presents the LLRF tests for the XFEL cryomodule validation, the challenges associated with automation, along with the first experimental results obtained on pre-series cryomodules tested at CMTB.
|
|