Author: Gu, X.
Paper Title Page
MOPPC022 Off-momentum Dynamic Aperture for Lattices in the RHIC Heavy Ion Runs 175
 
  • Y. Luo, M. Bai, M. Blaskiewicz, W. Fischer, X. Gu, A. Marusic, T. Roser, S. Tepikian, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
In this article we calculate and compare the off-momentum dynamic aperture for lattices with different phase advances per FODO cell in the RHIC heavy ion runs. A lattice with an increased phase advance was adopted in 2008-2011 to reduce transverse emittance growth rates from intra-beam scattering. However, during these runs, a large beam loss was observed with longitudinal RF re-bucketing which increased the momentum spread. With operational transverse stochastic cooling in the 2011 RHIC heavy ion run, the transverse intra-beam scattering emittance growth was eliminated, and the beam loss during stores was determined by the off-momentum aperture and burn-off from luminosity. We investigate the possibilities to increase the off-momentum dynamic aperture that would lead to an increase in the integrated luminosity.
 
 
MOPPC025 RHIC Polarized Proton Operation in Run 12 184
 
  • V. Schoefer, L. A. Ahrens, A. Anders, E.C. Aschenauer, G. Atoian, M. Bai, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, A. Dion, K.A. Drees, W. Fischer, C.J. Gardner, J.W. Glenn, X. Gu, M. Harvey, T. Hayes, L.T. Hoff, H. Huang, R.L. Hulsart, A. Kirleis, J.S. Laster, C. Liu, Y. Luo, Y. Makdisi, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, S. Nemesure, A. Poblaguev, V. Ptitsyn, V.H. Ranjbar, G. Robert-Demolaize, T. Roser, W.B. Schmidke, F. Severino, D. Smirnov, K.S. Smith, D. Steski, S. Tepikian, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, M. Wilinski, K. Yip, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Successful RHIC operation with polarized protons requires meeting demanding and sometimes competing goals for maximizing both luminosity and beam polarization. In Run 12 we sought to fully integrate into operation the many systems that were newly commissioned in Run 11 as well as to enhance collider performance with incremental improvements throughout the acceleration cycle. For luminosity maximization special attention was paid to several possible source of emittance dilution along the injector chain, in particular to optical matching during transfer between accelerators. Possible sources of depolarization in the AGS and RHIC were also investigated including the effects of local coupling and low frequency (10 Hz) oscillations in the vertical equilibrium orbit during the RHIC ramp. The results of a fine storage energy scan made in an effort to improve store polarization lifetime are also reported in this note.  
 
WEOBA01 Construction Progress of the RHIC Electron Lenses 2125
 
  • W. Fischer, Z. Altinbas, M. Anerella, E.N. Beebe, M. Blaskiewicz, D. Bruno, W.C. Dawson, D.M. Gassner, X. Gu, R.C. Gupta, K. Hamdi, J. Hock, L.T. Hoff, A.K. Jain, R.F. Lambiase, Y. Luo, M. Mapes, A. Marone, T.A. Miller, M.G. Minty, C. Montag, M. Okamura, A.I. Pikin, S.R. Plate, D. Raparia, Y. Tan, C. Theisen, P. Thieberger, J.E. Tuozzolo, P. Wanderer, S.M. White, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE under contract No DE-AC02-98CH10886 with the U.S. Department of Energy.
In polarized proton operation, the RHIC performance is limited by the head-on beam-beam effect. To overcome these limitations two electron lenses are under construction. We give an overview of the progress over the last year. Guns, collectors and the warm electron beam transport solenoids with their associated power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of gun, collector and some of the instrumentation. The RHIC infrastructure is being prepared for installation, and simulations continue to optimize the performance.
 
slides icon Slides WEOBA01 [7.672 MB]  
 
WEOBA02 Tevatron End-of-Run Beam Physics Experiments 2128
 
  • A. Valishev
    Fermilab, Batavia, USA
  • X. Gu, R. Miyamoto, S.M. White
    BNL, Upton, Long Island, New York, USA
  • J. Qiang
    LBNL, Berkeley, California, USA
  • F. Schmidt
    CERN, Geneva, Switzerland
 
  Funding: Fermi Research Alliance, LLC operates Fermilab under Contract DE-AC02-07CH11359 with the US Department of Energy. This work was partially supported by the US LHC Accelerator Research Program (LARP).
Before the Tevatron collider Run II ended in September of 2011, a two-week period was devoted to the experiments on various aspects of beam-beam interactions. The studied topics included offset collisions, coherent beam stability, effect of the bunch-length-to-beta-function ratio, and operation of AC dipole with colliding beams. In this report we summarize the results of beam experiments and supporting simulations.
 
slides icon Slides WEOBA02 [1.382 MB]  
 
WEPPD084 The E-Lens Test Bench for Rhic Beam-Beam Compensation 2720
 
  • X. Gu, Z. Altinbas, J.N. Aronson, E.N. Beebe, W. Fischer, D.M. Gassner, K. Hamdi, J. Hock, L.T. Hoff, P. Kankiya, R.F. Lambiase, Y. Luo, M. Mapes, J.-L. Mi, T.A. Miller, C. Montag, S. Nemesure, M. Okamura, R.H. Olsen, A.I. Pikin, D. Raparia, P.J. Rosas, J. Sandberg, Y. Tan, C. Theisen, P. Thieberger, J.E. Tuozzolo, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
To compensate for the beam-beam effects from the proton-proton interactions at IP6 and IP8 in the Relativistic Heavy Ion Collider (RHIC), we are fabricating two electron lenses that we plan to install at RHIC IR10. Before installing the e-lenses, we are setting-up the e-lens test bench to test the electron gun, collector, GS1 coil, modulator, partial control system, some instrumentation, and the application software. Some e-lens power supplies, the electronics for current measurement will also be qualified on test bench. The test bench also was designed for measuring the properties of the cathode and the profile of the beam. In this paper, we introduce the layout and elements of the e-lens test bench; and we discuss its present status towards the end of this paper.
 
 
THPPR032 A Split-Electrode for Clearing Scattered Electrons in the RHIC E-Lens 4038
 
  • X. Gu, W. Fischer, D.M. Gassner, K. Hamdi, J. Hock, Y. Luo, C. Montag, M. Okamura, A.I. Pikin, P. Thieberger
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
We are designing two electron lenses that will be installed at RHIC IR10 to compensate for the head-on beam-beam effect. To clear accumulated scattered electrons from 100 GeV proton-electron head-on collisions in the e-lens, a clearing split electrode may be constructed. The feasibility of this proposed electrode was demonstrated via the CST Particle Studio and Opera program simulations. By splitting one of the drift tubes in the e-lens and applying ~ 380 V across the two parts, the scattered electrons can be cleared out within several hundred micro-seconds. At the same time we can restrict the unwanted shift of the primary electron-beam that already passed the 2-m interaction region in e-lens, to less than 15um.