Author: Dawson, W.C.
Paper Title Page
TUPPC057 RHIC Spin Flipper Commissioning Results 1302
 
  • M. Bai, W.C. Dawson, J. Kewisch, Y. Makdisi, P. Oddo, C. Pai, P.H. Pile, T. Roser
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The five ac dipole design of RHIC spin flipper in the Blue ring was first commissioned during the RHIC 2012 polarized proton operation. The advantage of this design is to eliminate the vertical coherent betatron oscillations outside the spin flipper*. Spin flipping efficiency was measured with both 100 GeV and 250 GeV polarized proton beams. This paper presents the latest commissioning results.
* M. Bai , T. Roser, C. Dawson, Y. Makdisi, W. Meng, F. Meot, P. Oddo, C. Pai, P. Pile, RHIC Spin Flipper New Design and Commissioning Plan, IPAC10 proceedings, IPAC 2010, Kyoto, Japan, 2010
 
 
WEOBA01 Construction Progress of the RHIC Electron Lenses 2125
 
  • W. Fischer, Z. Altinbas, M. Anerella, E.N. Beebe, M. Blaskiewicz, D. Bruno, W.C. Dawson, D.M. Gassner, X. Gu, R.C. Gupta, K. Hamdi, J. Hock, L.T. Hoff, A.K. Jain, R.F. Lambiase, Y. Luo, M. Mapes, A. Marone, T.A. Miller, M.G. Minty, C. Montag, M. Okamura, A.I. Pikin, S.R. Plate, D. Raparia, Y. Tan, C. Theisen, P. Thieberger, J.E. Tuozzolo, P. Wanderer, S.M. White, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE under contract No DE-AC02-98CH10886 with the U.S. Department of Energy.
In polarized proton operation, the RHIC performance is limited by the head-on beam-beam effect. To overcome these limitations two electron lenses are under construction. We give an overview of the progress over the last year. Guns, collectors and the warm electron beam transport solenoids with their associated power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of gun, collector and some of the instrumentation. The RHIC infrastructure is being prepared for installation, and simulations continue to optimize the performance.
 
slides icon Slides WEOBA01 [7.672 MB]