Author: Berrutti, P.
Paper Title Page
WEPPC043 Transverse Kick Analysis of SSR1 Due to Possible Geometrical Variations in Fabrication 2306
 
  • M.H. Awida, P. Berrutti, I.V. Gonin, T.N. Khabiboulline, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
Due to fabrication tolerance, it is expected that some geometrical variations could happen to the SSR1 cavities of Project X, like small shifts in the transverse direction of the beam pipe or the spoke. It is necessary to evaluate the resultant transverse kick due to these geometrical variations, in order to make sure that they are within the limits of the correctors in the solenoids. In this paper, we report the transverse kick values for various fabrications errors and the sensitivity of the beam to these errors.
 
 
WEPPC044 Multipole Effects Study for Project X Front End Cavities 2309
 
  • P. Berrutti, M.H. Awida, I.V. Gonin, J.-F. Ostiguy, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Effects of RF field asymmetry along with multipoles have been studied in Project X front end cavities. One family of half wave resonators operating at 162.5 and two of spoke resonators operating at 325 MHz have been analysed. HWR and spoke resonators unlike elliptical cavities, do not have axial symmetry, hence a quadrupole perturbation to the beam is present. The purpose of this paper is to explain the approach and the calculation method used to understand and overcome the drawbacks due to the RF field asymmetry.  
 
WEPPC045 Optimization of the Geometric Beta for the SSR2 Cavities of the Project X 2312
 
  • P. Berrutti, M.H. Awida, I.V. Gonin, N. Solyak, A. Vostrikov, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Project X based on the 3 GeV CW superconducting Linac and is currently in the R&D phase. The cw SC Linac starts from a low-energy SCRF section (2.1 - 165 MeV) containing three different types of resonators. HWR f=162.5 MHz (2.1 - 11 MeV) having β= 0.11, SSR1 f= 325 MHz (11 - 35 MeV) having β = 0.21. In this paper we present the analysis that lead to the final design of SSR2 f=325 MHz cavity (35 - 165 MeV). We present the results of optimization of the geometric beta and the comparison between single, double and triple spoke resonators used in Project X frontend.  
 
WEPPC047 Effects of the RF Field Asymmetry in SC Cavities of the Project X 2318
 
  • I.V. Gonin, M.H. Awida, P. Berrutti, A. Saini, B.G. Shteynas, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, USA
  • P.N. Ostroumov
    ANL, Argonne, USA
 
  The low-energy SCRF section of CW SC linac of Project X starts from Half Wave Resonators (HWR) having operating frequency f=162.5 MHz, optimal β= 0.11 and will accelerate the beam from 2 MeV up to 11 MeV. The preliminary analysis of beam dynamics shows that multipole effects caused by asymmetry of RF fields in HWR cavities aren’t negligible. In this paper we present the analysis of influence of multipole effects on beam dynamics and discuss the possible solutions how to compensate these effects.  
 
WEPPC053 SSR1 HOM Analysis and Measurements 2333
 
  • M.H. Awida, P. Berrutti, I.V. Gonin, T.N. Khabiboulline, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
Single spoke resonators (SSR1, β=0.22) are currently under development for Project X at Fermilab. In this paper, extensive Higher Order Mode (HOM) analysis carried out on SSR1 is reported including the simulated R/Q for monopoles, dipoles, and quadrupoles. HOM measurements carried out on several spoke cavities are also reported including the harmonic response and the bead pull measurements. Comparison between the measured R/Q values and the simulated ones are presented.
 
 
THPPP091 Status of the Project-X CW Linac Design 3948
 
  • J.-F. Ostiguy, P. Berrutti, J.-P. Carneiro, V.A. Lebedev, S. Nagaitsev, A. Saini, B.G. Shteynas, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Superconducting CW linac was proposed for Project X to accelerate H beam from 2.1 MeV to 3 GeV with nominal peak and average currents of respectively 5 mA and 1 mA. Linac built of 5 different families of resonators: half-wave, spoke (2), and elliptical (2) working at 162.5 MHz 325 MHz and 650 MHz to cover all energy range. Cavities and focusing elements are assembled in cryomodules. In baseline design all cryomodules are separated by short warm sections. It makes machine more reliable and maintainable and provide space for beam diagnostics and collimation. A long (~10m) gap between cryomodules at1 GeV is also being considered to provide space for beam extraction for nuclear experimental program. In paper we present the latest lattice of the linac baseline design and results of beam studies for this lattice. We briefly compare performance of the baseline design with alternative one without half-wave resonator section.