Paper | Title | Other Keywords | Page |
---|---|---|---|
MOOCMH03 | Beam Commissioning Status of Superconducting Crab Cavities in KEKB | cavity, HOM, LLRF, status | 42 |
|
|||
Two superconducting crab cavities have been operated stably without any significant trouble for three years in KEKB since Feb/2007. At present (Dec/2009), maximum beam current with 'Crab ON' achieves 1200mA for HER (High Energy Ring, electron) and 1640mA for LER (Low Energy Ring, positron), respectively. RF trip rate per day due to crab cavity during 'physics run' was 2.8/day for HER and 0.4/day for LER at the beginning, and is 0.8/day for HER and 0.1/day for LER at present, respectively. Although Piezo actuator was frequently broken down at the beam abort with RF trip of the crab cavity, it was controlled stably by only LLRF (Low Level RF) feed-back system without Piezo actuator. Maximum HOM (Higher Order Mode) power, which is measured at HOM dampers made from ferrite, is 9.1kW for HER and 14.6kW for LER at the maximum beam current, respectively. LER crab voltage, which had suddenly dropped from 1.50MV to 1.10MV on March/2007, was gradually recovered from 1.14MV to 1.33MV in 2008. |
|||
|
|||
MOPEC055 | Status of the CW Power Couplers for the SRF Linac of the IFMIF Project | cryomodule, vacuum, linac, coupling | 585 |
|
|||
The driver of the International Fusion Material Irradiation Facility (IFMIF) consists of two 125 mA, 40 MeV CW deuteron accelerators. A superconducting option for the 5 to 40 MeV linac based on Half-Wave Resonators (HWR) has been chosen. The first cryomodule houses 8 HWR's supplied by high power RF couplers; each of them should be able to operate at 200 kW in CW. This paper will give an overview of the RF design of the 175 MHz CW power coupler. The detailled mechanical studies and the realization will be performed by the Industry. Global approach of the contract with the Industry and the organization of the intermediate validation tests will be discussed. In a second part, the choices and the last advances concerning the couplers RF power test stand will be described. |
|||
WEPEB003 | Fully Embedded EPICS-based Control of Low Level RF System for SuperKEKB | controls, EPICS, LLRF, feedback | 2686 |
|
|||
Gazing at SuperKEKB project, a new control subsystem was designed and implemented to upgrade the low level RF system of the KEKB accelerator based on Experimental and Industrial Control System (EPICS). The new control subsystem comprises a uTCA, a PLC, and an industrial PC. Each card plugged in the uTCA chassis and the PLC function as an embedded Input / Output Controller (IOC) by running the EPICS core program on the Linux operating system. The industrial PC runs Extensible Display Manger on Linux to serve as an Operator Interface (OPI). This paper describes the details of the design and the implementation of the fully embedded EPICS-based low level RF control subsystem for SuperKEKB. |
|||
THPEA043 | RF Pulse Compression Stabilization at the CTF3 CLIC Test Facility | cavity, klystron, feedback, controls | 3774 |
|
|||
In the CTF3 accelerator, the RF produced by each of ten 3 GHz klystrons goes through waveguides, RF pulse compressors and splitters. The RF phase and power transformation of these devices depend on their temperature. The quantitative effect of the room temperature variation on the RF was measured. It is the major source of undesired changes during the CTF3 operation. An RF phase-loop and a compressor temperature stabilization are developed to suppress the phase fluctuation and the power profile change due to the temperature variation. The implementation is transparent for operators it does not limit anyhow the flexibility of RF manipulations. Expected and measured suppression characteristics will be given. As well RF measurement dependence on the temperature will be mentioned. |