Paper |
Title |
Page |
TUPHA019 |
Optimized Calculation of Timing for Parallel Beam Operation at the FAIR Accelerator Complex |
411 |
|
- A. Schaller, J. Fitzek
GSI, Darmstadt, Germany
- D. Lorenz, F. Wolf
TU Darmstadt, Darmstadt, Germany
|
|
|
For the new FAIR accelerator complex at GSI the settings management system LSA is used. It is developed in collaboration with CERN and until now it is executed strictly serial. Nowadays the performance gain of single core processors have nearly stagnated and multicore processors dominate the market. This evolution forces software projects to make use of the parallel hardware to increase their performance. In this thesis LSA is analyzed and parallelized using different parallelization patterns like task and loop parallelization. The most common case of user interaction is to change specific settings so that the accelerator performs at its best. For each changed setting, LSA needs to calculate all child settings of the parameter hierarchy. To maximize the speedup of the calculations, they are also optimized sequentially. The used data structures and algorithms are reviewed to ensure minimal resource usage and maximal compatibility with parallel execution. The overall goal of this thesis is to speed up the calculations so that the results can be shown in a user interface with nearly no noticeable latency.
|
|
|
Poster TUPHA019 [1.378 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2017-TUPHA019
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPHA062 |
First Production Use of the New Settings Management System for FAIR |
1512 |
|
- J. Fitzek, H.C. Hüther, R. Müller, A. Schaller
GSI, Darmstadt, Germany
|
|
|
With the successful commissioning of CRYRING, the first accelerator being operated using the new control system for FAIR (Facility for Antiproton and Ion Research), also the new settings management system is now used in a production environment for the first time. Development efforts are ongoing to realize requirements necessary to support accelerator operations at FAIR. At CRYRING, new concepts for scheduling parallel beams are being evaluated. After these successful tests and the first production use, the focus now is to include major parts of the existing facility (synchrotron SIS18, storage ring ESR and transfer lines) into the system in the context of the Controls Retrofit project. First dry runs are planned for Q4 this year. The settings management system is based on the LSA framework, that was introduced at CERN in 2001 and is being developed and enhanced together in a collaboration with GSI. Notwithstanding all successes of LSA at both institutes, a review study was set up with the goal to make the LSA framework fit for the future. Outcomes of this study and impacts on the settings management system for FAIR are being presented.
|
|
|
Poster THPHA062 [4.633 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2017-THPHA062
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|