Paper | Title | Page |
---|---|---|
THPHA006 | Integration Challenges and Solutions for Low Level Controls Systems at the FRIB | 1348 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. The FRIB, is a new heavy ion accelerator facility currently under construction at Michigan State University. It is being built to provide intense beams of rare isotopes. The low level controls system integrates a wide variety of hardware into an EPICS/PLC based control system. This paper will present the challenges encountered with resulting hardware interfaces, and lessons learned that can be applied to future projects. These challenges include both technical design and project management challenges that are encountered when integrating hardware from other departments. |
||
![]() |
Poster THPHA006 [1.085 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-THPHA006 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |