Paper |
Title |
Page |
WEPD23 |
Commissioning of the ALBA Fast Orbit Feedback System |
691 |
|
- A. Olmos, S. Blanch-Torné, G. Cuní, Z. Martí, J. Moldes, R. Petrocelli, S. Rubio-Manrique, X. Serra-Gallifa, D. Yépez
ALBA-CELLS Synchrotron, Cerdanyola del Vallès, Spain
|
|
|
The ALBA Fast Orbit FeedBack system (FOFB) started its commissioning phase in September 2013, when all the required hardware was installed and the development of different controls for the feedback started. This report shows our experience tuning the different parameters to setup the system, together with vibration and beam noise measurements at different conditions. Finally, the present results and future steps for this system are described.
|
|
|
Poster WEPD23 [0.902 MB]
|
|
Export • |
reference for this paper to
※ LaTeX,
※ Text,
※ IS/RefMan,
※ EndNote (xml)
|
|
|