TY - CPAPER AU - Olmos, A. AU - Blanch-Torné, S. AU - Cuní, G. AU - Martí, Z. AU - Moldes, J. AU - Petrocelli, R. AU - Rubio-Manrique, S. AU - Serra-Gallifa, X. AU - Yépez, D. TI - Commissioning of the ALBA Fast Orbit Feedback System J2 - Proc. of IBIC2014 AB - The ALBA Fast Orbit FeedBack system (FOFB) started its commissioning phase in September 2013, when all the required hardware was installed and the development of different controls for the feedback started. This report shows our experience tuning the different parameters to setup the system, together with vibration and beam noise measurements at different conditions. Finally, the present results and future steps for this system are described. PB - JACoW CY - Geneva, Switzerland SP - 691 EP - 695 KW - kicker KW - feedback KW - injection KW - FPGA KW - controls DA - 2014/10 PY - 2014 SN - 978-3-95450-141-0 UR - http://jacow.org/IBIC2014/papers/wepd23.pdf ER -