Author: Pinayev, I.
Paper Title Page
TUBL1 NSLS-II BPM and Fast Orbit Feedback System Design and Implementation 316
 
  • O. Singh, B. Bacha, A. Blednykh, W.X. Cheng, J.H. De Long, A.J. Della Penna, K. Ha, Y. Hu, B.N. Kosciuk, M.A. Maggipinto, J. Mead, D. Padrazo, I. Pinayev, Y. Tian, K. Vetter, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II is a third generation light source under construction at Brookhaven National Laboratory. The project includes a highly optimized, ultra-low emittance, 3 GeV electron storage ring, linac pre-injector and full energy booster synchrotron. The low emittance requires high performance beam position monitor systems, providing measurement to better than 200 nm resolution; and fast orbit feedback systems, holding orbit to similar level of orbit deviations. The NSLS-II storage ring has 30 cells, each deploying up to 8 RF BPMs and 3 fast weak correctors. Each cell consists of a "cell controller", providing fast orbit feedback system infrastructure. This paper will provide a description of system design and summarize the implementation and status for these systems.  
slides icon Slides TUBL1 [5.225 MB]  
 
TUPF24 Instrumentation for the Proposed Low Energy RHIC Electron Cooling Project 561
 
  • D.M. Gassner, A.V. Fedotov, D. Kayran, V. Litvinenko, R.J. Michnoff, T.A. Miller, M.G. Minty, I. Pinayev, M. Wilinski
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy
There is a strong interest in running RHIC at low ion beam energies of 2.5-20GeV/nucleon; this is much lower than the typical operations with 100GeV/nucleon. The primary motivation for this effort is to explore the existence and location of the critical point on the QCD phase diagram. Electron cooling can increase the average integrated luminosity and increase the length of the stored lifetime. Simulations and conceptual cooling sub-system designs are underway. The present plan is to provide 10–50mA of bunched electron beam with adequate quality and an energy range of 0.9–5MeV. The preliminary cooling facility configuration planned to be fully inside the RHIC tunnel will include a 102.74MHz SRF gun, a booster cavity, a beam transport to the Blue ring to allow electron-ion co-propagation for ~10-20m, then a 180 degree u-turn electron transport so the same electron beam can similarly cool the Yellow ion beam, then to a dump. The electron beam instrumentation systems that will be described include current transformers, BPMs, profile monitors, a pepper pot emittance station and loss monitors.
 
poster icon Poster TUPF24 [1.588 MB]