MOPC05 Beam Diagnostics of SuperKEKB Damping Ring 53
 
  • H. Ikeda, A. Arinaga, J.W. Flanagan, H. Fukuma, H. Ishii, S. Kanaeda, K. Mori, M. Tejima, M. Tobiyama
    KEK, Ibaraki, Japan
 
  The KEKB accelerator ceased operation in 2010, and is being upgraded to SuperKEKB. Adopting low emittance and high current beams, the design luminosity is set at 40 times larger than that of KEKB. We are constructing a damping ring (DR) in order to achieve a low-emittance positron beam for injection. Turn-by-turn beam position monitors (BPMs), a transverse feedback system, a synchrotron radiation monitor (SRM), a DCCT, loss monitors using ion chambers, a bunch current monitor and a tune meter will be installed for beam diagnostics at the DR. An overview of the instrumentation of the DR will be presented in this paper.