Author: Sharamentov, S.I.
Paper Title Page
WEM1C03 The ATLAS Intensity Upgrade: Project Overview and Online Operating Experience 172
 
  • R.C. Pardo, A. Barcikowski, Z.A. Conway, C. Dickerson, M.R. Hendricks, M.P. Kelly, S.H. Kim, Y. Luo, S.W.T. MacDonald, B. Mustapha, P.N. Ostroumov, C.E. Peters, M.A. Power, R.H. Scott, S.I. Sharamentov, R.C. Vondrasek, G.P. Zinkann
    ANL, Argonne, USA
 
  Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357.
ATLAS, the world's first accelerator to use RF superconductivity for ion acceleration, has undergone a major facility upgrade with the goals of significantly increased stable-beam current for experiments and improved transmission for all beams. The dominant components of the upgrade are a) new CW-RFQ to replace the first three low β resonators, b) a new cryostat of seven β=0.077 quarter-wave resonators demonstrating world-record accelerating fields, c) an improved cryogenics system, and d) the retirement of the original tandem injector. This latest upgrade followed closely on the earlier development of a cryostat of β=0.144 quarter-wave resonators. This reconfigured ATLAS system has been in operation for over one year. This paper will discuss the on-line performance achieved for the redesigned system, plans for further improvement, and long term facility plans for new performance capabilities. This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357. This research used resources of ANL's ATLAS facility, which is a DOE Office of Science User Facility.
 
slides icon Slides WEM1C03 [3.586 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
WEA2I01 Charge Breeding Experiences with an ECR and an EBIS for CARIBU 186
 
  • R.C. Vondrasek, A. Barcikowski, C. Dickerson, P.N. Ostroumov, R.C. Pardo, A. Perry, G. Savard, R.H. Scott, S.I. Sharamentov
    ANL, Argonne, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357 and used resources of ANLs ATLAS facility, an Office of Science User Facility
The efficient and rapid production of a high-quality, pure beam of highly charged ions is at the heart of any radioactive ion beam facility. An ECR charge breeder, as part of the Californium Rare Ion Breeder Upgrade (CARIBU) program at Argonne National Laboratory, was developed to fulfill this role. The charge breeding efficiency and high charge state production of the source are at the forefront of ECR charge breeders, but its overall performance as part of the accelerator system is limited by a pervasive stable ion background and relatively long breeding times. Steps have been taken to reduce the level of background contamination but have met with limited success. As such, an EBIS charge breeder has been developed and is now running in an off-line configuration. It has already demonstrated good breeding efficiencies, shorter residence times, and reduced background, and it is scheduled to replace the ECR charge breeder in late 2015. The resultant change in duty cycle and time structure necessitates changes to the overall facility operation. The experiences with these breeders their strengths, their weaknesses, and the possible paths to further improvement - will be discussed.
 
slides icon Slides WEA2I01 [31.249 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)