Paper | Title | Page |
---|---|---|
MOP229 | Design of the MEBT1 for C-ADS Injector II | 115 |
|
||
The MEBT1 of Chinese ADS Injector II is described. It transports a 2.1 MeV, 10 mA CW proton beam through a series of 7 quadruples and two buncher cavities from the RFQ to the superconducting DTL. For emittance preservation, a compact mechanical design is required. Details of the beam dynamics and mechanical design will be given. | ||
TUO1B03 |
Study of Intense Beam Injection and Extraction of Heavy Ion Synchrotron | |
|
||
Experiments for physics research of RIB demands adequate particles stored and accelerated during limited experiment period. For Heavy Ion Research Facility at Lanzhou (HIRFL), the intensity of beam from injector cyclotrons is weak compared to Linac injectors, especially for heavy nuclei. The study to obtain intense heavy ion beam at HIRFL-CSRm synchrotron is presented here. The accelerated intense heavy ion beam is extracted by single turn extraction to hit the RIB production target or directly be transferred to HIRFL-CSRe experimental storage ring, or by 1/3 resonant slow extracted for external target experiments. The up to 10,000 s long period slow extraction is realized. | ||
![]() |
Slides TUO1B03 [11.075 MB] | |