Author: Saewert, G.W.
Paper Title Page
WEO3B03 PXIE at FNAL 414
 
  • N. Solyak, C.M. Baffes, A.Z. Chen, Y.I. Eidelman, B.M. Hanna, S.D. Holmes, V.A. Lebedev, S. Nagaitsev, J.-F. Ostiguy, R.J. Pasquinelli, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, D. Sun, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  PXIE is the integrated systems test for the Project X frontend. It is expected to accelerate 1-2 mA CW beam up to 30 MeV. The major goal of the project is a validation of the Project X concept and elimination of technical risks. It is expected to be constructed in the period of 2012-2016. In presentation the conceptual design of the experimental test facility, lattice and beam dynamics studies will be discussed in details.  
slides icon Slides WEO3B03 [4.561 MB]  
 
WEO3C03 Beam Halo Dynamics and Control with Hollow Electron Beams 466
 
  • G. Stancari, G. Annala, A. Didenko, T.R. Johnson, I.A. Morozov, V. Previtali, G.W. Saewert, V.D. Shiltsev, D.A. Still, A. Valishev, L.G. Vorobiev
    Fermilab, Batavia, USA
  • R.W. Aßmann, R. Bruce, S. Redaelli, A. Rossi, B. Salvachua, G. Valentino
    CERN, Geneva, Switzerland
  • D.N. Shatilov
    BINP SB RAS, Novosibirsk, Russia
 
  Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract DE-AC02-07CH11359 with the US Department of Energy. Partial support was provided by the US LHC Accelerator Research Program (LARP).
Experimental measurements of beam halo diffusion dynamics with collimator scans are reviewed. The concept of halo control with a hollow electron beam collimator, its demonstration at the Tevatron, and its possible applications at the LHC are discussed.
 
slides icon Slides WEO3C03 [5.139 MB]