MOOBI2 | XFEL/SPring-8 Construction and SCSS Operation Status | undulator, vacuum, status, klystron | 20 |
|
|||
XFEL/SPring-8 construction was started in 2006, aiming at generating X-ray laser at 1 Angstrom. The building construction was completed in April 2009, followed by installation of accelerator components. In March 2010, we completed all accelerating structure installation. The klystron modulator and LLRF systems are under installation. We use 19 undulator of in-vacuum type (5 m each). At this moment 10 undulators have been installed and careful qualification of undulator field is carried out. We will start high power processing in this October, and we will send the first electron beam into beam dump before April 2011, followed by beam commissioning for X-ray lasing. |
|||
|
|||
THOAI2 | Intra-train Longitudinal Feedback for Beam Stabilization at FLASH | feedback, laser, electron, controls | 537 |
|
|||
The Free electron LASer at Hamburg (FLASH) is a linear accelerator of 330m length. It provides laser pulses with pulse duration between 10 and hundreds fs in the soft X-ray wavelength range below 5nm produced in SASE process from electron bunches with an energy up to 1.2 GeV. FLASH works in pulse mode with repetition rate of 10 Hz where up to 800 bunches at a bunch spacing of 1 us are accelerated in one macro-pulse. The electron beam time structure is well suited for fast intra-train feedbacks using beam based measurements incorporated to the Low Level Radio Frequency (LLRF) control system of the accelerator structures to further improve the bunch compressions, bunch arrival and bunch energy stability directly impacting the quality of the FEL photon beam. In this paper, we present the beam based signal pre-processing, the implementation into LLRF system, the mandatory exception handling for robust operation and the imbedding of the real-time ~ 2us latency fast intra-train feedback with feedbacks for the removal of slow and repetitive errors. First results of the achieved intra-train bunch arrival and peak current stability will be presented together with observed limitations. |
|||
|