TUAAU06 Status of fs-THz Beam Line Project of the PAL 204
 
  • H.-S. Kang, S. D. Jang, C. Kim, H.-G. Kim, W. W. Lee, C. D. Park, S. J. Park, Y. J. Park, J. H. Seo, Y. G. Son
    PAL, Pohang, Kyungbuk
 
  A femto-second THz radiation (fs-THz) facility is under construction at the Pohang Accelerator Laboratory (PAL), which is one of the beamline projects of Pohang Light Source (PLS). The facility will use a 60-MeV electron linac, which consists of an S-band photocathode RF gun with 1.6 cell cavity, two S-band accelerating structures, and two chicane-type bunch compressors. To generate intense femto-second THz radiation up to 3 THz, the electron beam with charge of 0.5 nC should be compressed down to below 150 fs. Two kinds of radiator will be prepared for pump-probe experiments for beamline: transition radiation for THz radiation (probe) and Cherenkov radiation for visible radiation (pump). The installation of the accelerator components was completed in April 2008 and the rf conditioning will end by July 2008, and the electron beam test will start in August 2008. In this article, we will present the status of the construction and commissioning of the accelerator as well as the beam dynamics design and its simulation results.