WPAE029 | Tevatron Beam-beam Compensation Project Progress | 2083 |
|
||
Funding: Work supported by the Universities Research Assos., Inc., under contract DE-AC02-76CH03000 with the U.S. Dept. of Energy. The 2nd Tevatron electron lens (TEL2) is under the final phase of development and prepare for the installation in the Tevatron. In this report, we will describe the system and the main upgrades from the TEL1. We will also show the magnetic field measurement results, beam testing and plan for installation. The special operation consideration of the TEL2 under high radiation dose will also be discussed. |
||
ROPC006 | Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons | 540 |
|
||
A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons. |