Paper |
Title |
Page |
TPAH022 |
RHIC Gamma Transition Jump Power Supply Prototype Test |
1279 |
|
- J.L. Mi, D. Bruno, G. Ganetis, G. Heppner, W. Louie, J. Sandberg, R. Zapasek, W. Zhang (BNL)
|
|
FPAH003 |
RHIC Insertion Region, Shunt Power Supply Current Errors |
3660 |
|
- D. Bruno, G. Ganetis, R.F. Lambiase, J. Sandberg (BNL)
|
|
FPAH004 |
Overview of the RHIC Insertion Region, Sextupole, and Snake Power Supply Systems |
3663 |
|
- D. Bruno, W. Eng, G. Ganetis, R.F. Lambiase, J. Sandberg (BNL)
|
|
FPAH006 |
Running the AGS MMPS at 5 Hz, 24 GeV |
3669 |
|
- I. Marneris, T. Roser, A.G. Ruggiero, J. Sandberg (BNL)
|
|
FPAH020 |
Beam Coupling Phenomena in Fast Kicker Systems |
3708 |
|
- W. Zhang, L.A. Ahrens, J.W. Glenn, J. Sandberg, N. Tsoupas (BNL)
|
|
FPAH021 |
RHIC Beam Abort Kicker Power Supply System Commissioning Experience and Remaining Issues |
3711 |
|
- W. Zhang, L.A. Ahrens, J.L. Mi, B. Oerter, J. Sandberg, R. Sanders (BNL)
|
|
FPAH022 |
A New Conceptual Design of the SNS Full Turn Fast Extraction Kicker Power Supply System |
3714 |
|
- W. Zhang, R.F. Lambiase, J.L. Mi, T. Nehring, C. Pai, J. Sandberg, N. Tsoupas, J.E. Tuozzolo, D. Warburton (BNL)
|
|