Author: Rey, S.F.
Paper Title Page
TUPIK032 AWAKE Proton Beam Commissioning 1747
 
  • J.S. Schmidt, D. Barrientos, M. Barros Marin, B. Biskup, A. Boccardi, T.B. Bogey, T. Bohl, C. Bracco, S. Cettour Cave, H. Damerau, V. Fedosseev, F. Friebel, S.J. Gessner, A. Goldblatt, E. Gschwendtner, L.K. Jensen, V. Kain, T. Lefèvre, S. Mazzoni, J.C. Molendijk, A. Pardons, C. Pasquino, S.F. Rey, H. Vincke, U. Wehrle
    CERN, Geneva, Switzerland
  • J.T. Moody
    MPI-P, München, Germany
  • K. Rieger
    MPI, Muenchen, Germany
 
  AWAKE will be the first proton driven plasma wakefield acceleration experiment worldwide. The facility is located in the former CNGS area at CERN and will include a proton, laser and electron beam line merging in a 10 m long plasma cell, which is followed by the experimental diagnostics. In the first phase of the AWAKE physics program, which started at the end of 2016, the effect of the plasma on a high energy proton beam will be studied. A proton bunch is expected to experience the so called self-modulation instability, which leads to the creation of micro-bunches within the long proton bunch. The plasma channel is created in a rubidium vapor via field ionization by a TW laser pulse. This laser beam has to overlap with the proton beam over the full length of the plasma cell, resulting in tight requirements for the stability of the proton beam at the plasma cell in the order of ~ 0.1 mm. In this paper the beam commissioning results of the ~810 m long transfer line for proton bunches with 3·1011 protons/bunch and a momentum of 400 GeV/c will be presented with a focus on the challenges of the parallel operation of the laser and proton beam.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK032  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPIK095 High Power X-Band Generation Using Multiple Klystrons and Pulse Compression 4311
 
  • B.J. Woolley, T. Argyropoulos, N. Catalán Lasheras, G. McMonagle, S.F. Rey, I. Syratchev, W. Wuensch
    CERN, Geneva, Switzerland
  • D. Esperante Pereira
    IFIC, Valencia, Spain
  • J. Tagg
    National Instruments Switzerland, Ennetbaden, Switzerland
  • M. Volpi
    The University of Melbourne, Melbourne, Victoria, Australia
 
  CERN has constructed and is operating a new X-band test stand containing two pairs of 12 GHz, 6 MW klystrons. By power combination through hybrid couplers and the use of pulse compressors, up to 45 MW of peak power can be sent to any of 4 test slots at pulse repetition rates up to 400 Hz. The test stand is dedicated to RF conditioning and testing of high gradient accelerating structures for the CLIC study and also future X-band FELs. Operations have been ongoing for a few months, with initial operation dedicated to control algorithm development. Significant progress has been made in understanding the unique challenges of high power RF combination and phase switching using RF hybrids.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPIK095  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)