Paper | Title | Page |
---|---|---|
MOOHC2 | The US Electron Ion Collider Accelerator Designs | 1 |
|
||
With the completion of the National Academies of Sciences Assessment of a US Electron-Ion Collider, the prospects for construction of such a facility have taken a step forward. This paper provides an overview of the two site-specific EIC designs: JLEIC (Jefferson Lab) and eRHIC (BNL) as well as brief overview of ongoing EIC R&D. | ||
![]() |
Slides MOOHC2 [14.774 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-MOOHC2 | |
About • | paper received ※ 29 August 2019 paper accepted ※ 04 September 2019 issue date ※ 08 October 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOYBA4 | eRHIC Design Update | 18 |
TUPLO11 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The future electron-ion collider (EIC) aims at an electron-proton luminosity of 1033 to 1034 cm-2 sec-1 and a center-of-mass energy range from 20 to 140 GeV. The eRHIC design has been continuously evolving over a couple of years and has reached a considerable level of maturity. The concept is generally conservative with very few risk items which are mitigated in various ways. |
||
![]() |
Slides MOYBA4 [5.466 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-MOYBA4 | |
About • | paper received ※ 24 August 2019 paper accepted ※ 31 August 2019 issue date ※ 08 October 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPLO03 | RHIC Beam Abort System Upgrade Options | 536 |
|
||
Funding: Work supported by U.S. DOE under contract No DE-AC02-98CH10886 with the U.S. Department of Energy. The RHIC ion (polarized proton) beam intensity has increased to 4x (1.1x) of the original design specifications. In 2013 proton beam currents overcame the eddy current reduction design features in the RHIC beam abort system kicker magnets causing ferrite heating and resulting in a reduction of the kicker strength. In 2014, the abort kicker ferrites were changed, the eddy current reduction design was upgraded, and an active ferrite cooling loop installed to prevent heating. For ions the beam dump vacuum window was changed from stainless steel to a titanium alloy and the adjacent beam diffuser block carbon material was changed to allow for higher ion intensities. A thicker beam pipe was installed to prevent secondaries from quenching the adjacent superconducting quadrupole. With these upgrades there is at least a factor 2 of safety margin for the demonstrated intensities to date. For a further increase in the intensity for RHIC and eRHIC we evaluate upgrade options for the beam abort system. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-TUPLO03 | |
About • | paper received ※ 26 August 2019 paper accepted ※ 05 September 2019 issue date ※ 08 October 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |