Author: Toge, N.
Paper Title Page
MOPMF073 Rejuvenation of 7-Gev SuperKEKB Injector Linac 300
 
  • K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, A. Enomoto, Y. Enomoto, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, K. Nakao, T. Natsui, M. Nishida, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, I. Satake, M. Satoh, Y. Seimiya, A. Shirakawa, H. Sugimura, T. Suwada, T. Takenaka, M. Tanaka, N. Toge, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
 
  KEK injector linac has delivered electrons and positrons for particle physics and photon science experiments for more than 30 years. It was upgraded for the SuperKEKB project, which aims at a 40-fold increase in luminosity over the previous project KEKB, in order to increase our understanding of flavor physics beyond the standard model of elementary particle physics. SuperKEKB energy-asymmetric electron-positron collider with its extremely high luminosity requires a high current, low emittance and low energy spread injection beam from the injector. The electron beam is generated by a new type of RF gun, that provides a much higher beam current to correspond to a large stored beam current and a short lifetime in the ring. The positron source is another major challenge that enhances the positron bunch intensity from 1 to 4 nC by increasing the positron capture efficiency, and the positron beam emittance is reduced from 2000 μm to 10 μm in the vertical plane by introducing a damping ring, followed by the bunch compressor and energy compressor. The summary of the rejuvenation is reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF073  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAL002 Improvement of Personnel and Machine Protection System in Superkekb Injector Linac 2140
 
  • I. Satake, H. Honma, A. Shirakawa, N. Toge
    KEK, Ibaraki, Japan
 
  Since summer of 2010, the radiation control area for the KEK electron positron injector linac had been split at the around 3 GeV point by a concrete wall into upstream and downstream parts with independent beam sources. This was so as to allow operation of the downstream part for beam injection into photon factory rings while construction and development of new electron guns proceed in the upstream part. In summer of 2017, this arrangement was revised and the entire injector linac was reconsolidated into a single radiation control area. This was in conjunction with the introduction of the 1.1 GeV positron damping ring for Phase-II operation of SuperKEKB and successful development of new electron RF guns in the far upstream part of the linac. Along with this reconsolidation, the personnel and machine protection system was modified and improved. Interlock signal lines for the damping ring and RF guns were added. The operation panel of the main console was modified accordingly. In addition, the screen displays of the interlock status were updated. In this paper we report on the renewed system of KEK injector linac in detail.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAL002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)