Paper | Title | Page |
---|---|---|
TUPAL073 | Conceptual Design of a Drift Tube LINAC for Proton Therapy | 1182 |
SUSPF056 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: National Key Research and Development Program of China (grant number 2016YFC0105408) The conceptual design of an Alvarez-type Drift Tube Linac for one proton therapy facility is described in this paper. The design optimization of the Drift Tube Linac is carried out in the principle of adopting domestic mature technologies and cost control. The error study of the Drift Tube Linac is also given in this paper. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL073 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAL075 | Mechanical Design and Error Analysis of a 325 MHz IH-DTL Test Cavity | 1186 |
|
||
A 325 MHz interdigital H-mode drift tube linac (IH-DTL) test cavity with a modified KONUS beam dynamics is under fabrication at Tsinghua University. The inner diameter of the tank increases from 196.8 to 232.6 mm. The mechanical design is considered carefully because of its small geometry. A three-piece design has been adopted in the mechanical design. The error analysis is carried out to determine the error requirement of machining and alignment. The details of mechanical design and error analysis is presented. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL075 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL110 | High-Power RF Test of Coaxial Couplers for the Injection Linac of XiPAF | 3899 |
|
||
For the high-power RF test of the coaxial couplers which will be employed on the linac injector of the XiPAF (Xi'an Proton Application Facility) project, a high-power conditioning cavity was designed and manufactured [1]. There are some optimized aspects on the cavity and couplers to obtain better RF performance during the high-power testing process. The traveling-wave test and full-power-reflection test were executed to check whether the coupler can afford the enough power level for the linac operation, and whether only one coupler can afford the total power for the RFQ. The construction of the testing stand, optimization of RF parameters and results of high-power RF test are presented in this paper. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL110 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |