TUPAL010 | Research on an Accelerator-Based BNCT Facility | 1024 |
|
||
Seven people have been diagnosed with cancer per minute in China, and cancer has been the leading cause of death with about one fourth of all deaths in China. As effective means and ways for cancer therapy, Boron Neutron Cancer Therapy (BNCT) has drawn greater attention. Accelerator based neutron source is a compact neutron source, and technologies of accelerating a high current beam has matured. We proposed an accelerator based BNCT (AB-BNCT), which can accelerate a 10 mA proton beam up to 7 MeV and target on a shelled-Beryllium. The dynamics of accelerators and neutron calculations will be reported in this paper. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL010 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAL011 | Low Power Test and Tuning of the LEAF RFQ | 1028 |
|
||
A continuous wave (CW) four-vane radio frequency quadrupole (RFQ) accelerator is under construction for the Low Energy Accelerator Facility (LEAF) at Institute of Modern Physics (IMP). The 5.96 m RFQ will operate with the capability of accelerating all ion species from proton to uranium from 14 keV/u up to 500 keV/u. In this paper, the low power test and tuning results of the RFQ accelerator, including the test of the separate sections and the whole cavity, will be presented. After the final tuning, the relative error of the quadrupole field is within 2% and the admixture of the dipole modes are below 4% of the quadrupole mode. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL011 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL002 | RF System Operation of High Current RFQ in ADS Project | 3613 |
|
||
Funding: Work supported by Natural Science Foundation of China, No.11505253 New RF system has been upgraded several times for high-current operation, especially for extra beam power and detuning angle. The current was increased gradually resulting in more and more frequency detuning, and an effective method is to tune the temperature of cavity to compromise detuning. Of course, the power dissipated in cavity and high intensity beam are approximately 120kW resulting in too many power modules operated in the high risk of failure. The specific analysis and simulation were introduced in detail. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL002 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |