MOZGBF2 Status of the FAIR Project 63
 
  • P.J. Spiller, M. Bai, O. Boine-Frankenheim, A. Dolinskyy, F. Hagenbuck, C.M. Kleffner, K. Knie, S. Menke, C. Omet, A. Schuhmann, H. Simon, M. Winkler
    GSI, Darmstadt, Germany
  • J. Blaurock, M. Ossendorf
    FAIR, Darmstadt, Germany
  • I. Koop
    BINP SB RAS, Novosibirsk, Russia
  • D. Prasuhn, R. Tölle
    FZJ, Jülich, Germany
 
  The realization of the new Facility for Antiproton and Ion Research, FAIR at GSI, Germany, has advanced significantly. The civil construction process of the Northern part of the building complex, including the excavation of the SIS100 synchrotron tunnel has been launched end of 2017. On site of the GSI campus, major preparations and upgrade measures for the injector operation of the existing accelerator facilities are ongoing and will be completed mid of 2018. The shielding of the SIS18 accelerator tunnel has been enhanced for the booster operation at high repetition rates and high intensity Proton beams. Two new transformer stations were set-up and commissioned which will provide the required pulse and common power for FAIR. All major contracts for series production of SIS100 components have been signed and a large number of the superconducting SIS100 magnets has been produced and accepted. Major testing infrastructures for superconducting magnets of SIS100 and Super-FRS have been set-up at JINR, CERN and GSI. Also for all other FAIR accelerator systems, the procurement of the components is progressing well  
slides icon Slides MOZGBF2 [4.266 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOZGBF2  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF085 Status of Link Existing Facility Project for FAIR 934
 
  • J. Stadlmann, C. Omet, A. Schuhmann, P.J. Spiller
    GSI, Darmstadt, Germany
 
  The project "Link existing Facility", or GaF (GSI Anbindung an FAIR), is an important subproject of the overall FAIR facility. In order to serve as injector for SIS100, the main accelerator of FAIR, the existing GSI synchrotron SIS18 is undergoing an upgrade program leading to about 100 times higher beam intensities. Especially the foreseen operation with 4 GeV Protons with up to 5·1012 protons per second increases the radiation protection requirements to such an extent that the existing radiation protection measures are no longer sufficient. The project consists of 78 individual measures. The four most substantial activities are the construction of a table-like structure to carry additional shielding. The creation of an opening and a first part of transfer tunnel for the beamlines towards the future FAIR campus. The preparation for the building, beam dump and connection of the FAIR proton injector. The incorporation of state-of-the-art radiation- and fire-protection measures into the present facilities including the a new technical building to house technical infrastructure. We report on the project status which is foreseen to finish mid-2018.  