Author: Romagnoli, G.
Paper Title Page
TUPAF025 Multi-turn Study in FLUKA for the Design of CERN-PS Internal Beam Dumps 724
 
  • J.A. Briz Monago, M. Calviani, F. Cerutti, J.J. Esala, S.S. Gilardoni, F.-X. Nuiry, G. Romagnoli, G. Sterbini, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The CERN Proton-Synchrotron (PS) accelerator is currently equipped with two internal beam dumps in operation since the 1970's. An upgrade is required to be able to withstand the beams that will be produced after the end of the LIU (LHC Injector Upgrade) project. For the design of the new dumps, the interaction and transport of beam and all secondary particles generated has been simulated using FLUKA. The working principle of the internal beam dump in the PS ring is very peculiar with respect to the other dumps in the CERN accelerator complex. A moving dump intercepts the circulating beam during few milliseconds like a fast scraper. The moving dump shaving the beam, the multi-turn transport of beam particles in the PS accelerator and a time-dependent energy deposition in the dump were modeled. The methodology and the results obtained in our studies for the dump core and downstream equipment will be reported in this contribution.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF025  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG001 Engineering Design and Prototyping of the New LIU PS Internal Beam Dumps 2600
 
  • G. Romagnoli, J.A. Briz Monago, M.E.J. Butcher, M. Calviani, D.G. Cotte, Y. C. Coutron, J.J. Esala, E. Grenier-Boley, J. Hansen, A. Huschauer, A. Masi, F.-X. Nuiry, D. Steyart, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  For the LHC Injectors Upgrade (LIU) at CERN, the two Proton Synchrotron (PS) internal dumps are redesigned and upgraded for the new high intensity/brightness beams. The dumps are installed as active elements in the lattice in straight sections between the main bending magnets. The dumps are moved into the beam when requested by operation and shave the circulating beam turn by turn stopping the beam after about 6 ms. The shaving induces a very localized beam energy deposition on the dump surface in a thickness of tens of microns. A completely new approach has been developed with FLUKA to simulate beam shaving, coupled with ANSYS to define a new dump core design. This paper presents the design of the dump based on operational constraints such as cycling 200 000 times per year for 20 years, limited access for maintenance or reaching the beam trajectory in 150 ms. These constraints had a major impact on the technological choices. The new dump core is made of a low-density graphite block followed by a denser copper alloy (CuCr1Zr) one. Water circuits, bonded with Hot Isostatic Pressing, are cooling the core in ultra-high vacuum. The core is moved by a spring-based actuation mechanism.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG002 Beam Dump Facility Target: Design Status and Beam Tests in 2018 2604
 
  • E. Lopez Sola, O. Aberle, P. Avigni, L. Bianchi, J. Busom, M. Calviani, M. Casolino, J.P.C. Espadanal, M.A. Fraser, S. Girod, B. Goddard, D. Grenier, M. Guinchard, C. Heßler, R. Illan Fiastre, R. Jacobsson, M. Lamont, A. Ortega Rolo, B. Riffaud, G. Romagnoli, L. Zuccalli
    CERN, Geneva, Switzerland
 
  The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. In addition to high thermo-mechanical loads, the most challenging aspects of the proposed installation lie in very high energy and power density deposition that are reached during operation. In order to validate the design of the BDF target, a scaled prototype is going to be tested during 2018 in the North Area at CERN, upstream the existing beryllium primary targets. The prototype testing under representative beam scenarios will allow having an insight of the material response in an unprecedented regime. Online monitoring and an extensive Post Irradiation Experimental (PIE) campaign are foreseen. The current contribution will detail the design and handling aspects of the innovative Target Complex as well as the design of the BDF target/dump core and the design and construction of the prototype target assembly.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG003 Analysis and Operational Feedback of the New High-Energy Beam Dump in the CERN SPS 2608
 
  • A. Perillo-Marcone, M. Calviani, R. Illan Fiastre, P. Rios Rodriguez, G. Romagnoli
    CERN, Geneva, Switzerland
 
  The CERN Super Proton Synchrotron (SPS) high-energy internal dump (TIDVG) is used to intercept beam dumps from 102.2 to 450 GeV. An inspection in 2013 revealed significant beam induced damage to the aluminium absorbing block, resulting in operational limitations to minimize the risk of reproducing this phenomenon. Additionally, in 2016 a vacuum leak was detected in the dump assembly, which imposed further limitations, i.e., a reduction of the beam intensity that could be dumped. In the winter stop of 2016-2017, a new version of the TIDVG (featuring several design modifications) was installed. This paper analyses the performance of the dump observed during the commissioning period and subsequent operation in 2017 of the most recent installed version of the TIDVG. The temperature measurements recorded during this time were used to benchmark numerical models that allow predicting the performance of the dump under different conditions. After several iterations, a good agreement between simulations and real measurements was obtained; resulting in numerical models that can produce reliable results for this and other devices with similar design.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG004 Design of the Future High Energy Beam Dump for the CERN SPS 2612
 
  • S. Pianese, J.A. Briz Monago, M. Calviani, D. Grenier, P.B. Heckmann, J. Humbert, R. Illan Fiastre, A. Perillo-Marcone, G. Romagnoli, S. Sgobba, D. Steyart, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The future CERN Super Proton Synchrotron (SPS) internal dump (Target Internal Dump Vertical Graphite, known as TIDVG#5), to be installed during CERN's Long Shutdown 2 (2019-2020), will be required to intercept beam dumps from 26 to 450 GeV, with increased intensity and repetition rates with respect to its predecessor (TIDVG#4). The beam power to be managed by the dump will increase by approximately a factor of four; resulting in new challenges in terms of design in order to fulfil the highly demanding specification, which is based on guaranteeing a good performance of the machine with little or no limitations imposed by this device. This paper presents the proposed design, including material selection, manufacturing techniques and thermo-mechanical simulations under different operational scenarios expected during the lifetime of the device.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)