Tooling Systems for the Assembly and Integration of the SSR1 Cryomodule for PIP-II Project at Fermilab |
2710 |
|
- D. Passarelli, F. Di Ciocchis, M. Parise, V. Roger
Fermilab, Batavia, Illinois, USA
|
|
|
In this paper we present the assembly strategy and tooling design for the SSR1 cryomodule from the cavity string to the final module. Several challenging aspects were considered to minimize undesired stresses on critical components, to preserve the alignment of cavities and solenoids during final assembly, and ultimately to meet the technical requirements of the PIP-II project at Fermilab.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML014
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPML019 |
Design Update of the SSR1 Cryomodule for PIP-II Project |
2721 |
|
- V. Roger, S. Cheban, T.H. Nicol, Y.O. Orlov, D. Passarelli, P. Vecchiolla
Fermilab, Batavia, Illinois, USA
|
|
|
This paper reports the design update of the Single Spoke Resonator 1 (SSR1) cryomodule developed in the framework of PIP-II project at Fermilab. The most re-cent design changes and results of calculations per-formed to optimize the vacuum vessel, current leads, piping system and thermal shield are described. Then the estimated heat loads of the cryomodule leading to the sizing of the cryogenic valves will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML019
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|