Author: Reid, J.
Paper Title Page
WEPML011 Garnet Ring Measurements for the Fermilab Booster 2nd Harmonic Cavity 2700
 
  • R.L. Madrak, J.E. Dey, K.L. Duel, J. Kuharik, A.V. Makarov, W. Pellico, J. Reid, G.V. Romanov, M. Slabaugh, D. Sun, C.-Y. Tan, I. Terechkine
    Fermilab, Batavia, Illinois, USA
 
  A perpendicularly biased tuneable 2nd harmonic cavity is being constructed for use in the Fermilab Booster. The cavity's tuner uses National Magnetics AL800 garnet as the tuning media. For quality control, the magnetic properties of the material and the uniformity of the properties within the tuner must be assessed. We describe two tests which are performed on the rings and on their corresponding witness samples.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML011  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML012 Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster 2703
 
  • R.L. Madrak, J.E. Dey, K.L. Duel, M.R. Kufer, J. Kuharik, A.V. Makarov, R.D. Padilla, W. Pellico, J. Reid, G.V. Romanov, M. Slabaugh, D. Sun, C.-Y. Tan, I. Terechkine
    Fermilab, Batavia, Illinois, USA
 
  A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main purpose of adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years of testing and optimization, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status of the construction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF024 Commissioning and Operation of FAST Electron Linac at Fermilab 4096
 
  • A.L. Romanov, C.M. Baffes, D.R. Broemmelsiek, K. Carlson, D.J. Crawford, N. Eddy, D.R. Edstrom, E.R. Harms, J. Hurd, M.J. Kucera, J.R. Leibfritz, I.L. Rakhno, J. Reid, J. Ruan, J.K. Santucci, V.D. Shiltsev, G. Stancari, R.M. Thurman-Keup, A. Valishev, A. Warner
    Fermilab, Batavia, Illinois, USA
 
  We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The pho-toinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commission-ing such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)