Author: Passarello, S.
Paper Title Page
TUPML071 Experimental Performance of the Chopper for the ESS Linac 1709
 
  • G. Torrisi, L. Allegra, A.C. Caruso, G. Castro, L. Celona, G. Gallo, S. Gammino, O. Leonardi, A. Longhitano, D. Mascali, L. Neri, S. Passarello, G. Sorbello
    INFN/LNS, Catania, Italy
 
  At the Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (INFN-LNS) the beam commissioning of the high intensity Proton Source for the European Spallation Source (PS-ESS) was completed in November 2017. The ESS requires a high intensity proton beam (74 mA pulsed at 14 Hz of repetition rate), with fast Beam pulse rise/fall time (< 20 μs). In order to meet the project requirement, an electrostatic chopping system has been used in the Low Energy Beam Transport (LEBT). The design of the control system was done also to be the main element of the fast beam abort system and taking into account the radiation issue in the accelerator tunnel. This paper describes the performances of the chopper. The experimentally-achieved rise/fall times of the beam pulses measured by using an AC Current Transformer (ACCT) at the end of the LEBT collimator, are presented. An experimental investigation of the effects of different amounts and types of gas injected into the LEBT (for the sake of space charge compensation) has been carried out with respect to the beam and chopper parameters.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPML071  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPML073 Ion Source and Low Energy Beam Transport Line Final Commissioning Step and Transfer from INFN to ESS 1712
 
  • L. Celona, A. Amato, G. Calabrese, A.C. Caruso, G. Castro, F. Chines, S. Gammino, O. Leonardi, A. Longhitano, G. Manno, S. Marletta, D. Mascali, A. Maugeri, M. Mazzaglia, A. Miraglia, L. Neri, S. Passarello, A. Seminara, D. Siliato, A. Spartà, G. Torrisi
    INFN/LNS, Catania, Italy
 
  At the Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (INFN-LNS), the beam commissioning of the high intensity Proton Source for the European Spallation Source (PS-ESS) was completed in November 2017. All requirements have been satisfied and certified by the European Spallation Source (ESS). In the last step of the commissioning a complete characterization of the source has been carried out and some results are hereinafter reported. The shipment of the source was done in December 2017, followed by the installation in January while the beam commissioning is foreseen during summer 2018. The paper describes the final commissioning steps at INFN-LNS, the procedure adopted for a safe transfer of the equipment, the transfer of knowledge needed for the operation and the maintenance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPML073  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)