Paper | Title | Page |
---|---|---|
TUPML073 | Ion Source and Low Energy Beam Transport Line Final Commissioning Step and Transfer from INFN to ESS | 1712 |
|
||
At the Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (INFN-LNS), the beam commissioning of the high intensity Proton Source for the European Spallation Source (PS-ESS) was completed in November 2017. All requirements have been satisfied and certified by the European Spallation Source (ESS). In the last step of the commissioning a complete characterization of the source has been carried out and some results are hereinafter reported. The shipment of the source was done in December 2017, followed by the installation in January while the beam commissioning is foreseen during summer 2018. The paper describes the final commissioning steps at INFN-LNS, the procedure adopted for a safe transfer of the equipment, the transfer of knowledge needed for the operation and the maintenance. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPML073 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |